TECHNICAL ASSISTANCE
17
LOCATION OF PROBES
Well for
DOMESTIC HOT
WATER PROBE
Well for
BOILER PROBE
Well for
AUXILIARY
PROBE
Well for
SOLAR
CONTROLLER
PROBE
r
KOMBI
combination storage cylinders incorpo-
rate probe wells for fitting the solar controller and boiler
probes. Make sure that these probes are inserted all the
way.
b
To access the well for the domestic hot water
probe, you must remove the two flange covers.
(Drill a hole for the cable if necessary).
b
Installers are responsible for all connections to
the boiler or hot water generator. Installers must
ensure proper installation and functioning in
compliance with all applicable legislation.
It is essential to perform the following checks before
starting up or testing the functioning of the combination
storage cylinder. In particular, check that:
- The supply cocks are all open in the domestic water
circuit.
- The water connections to the boiler and solar heating
system have been made correctly.
- The solar heating circuit has been correctly flushed out
and filled with water-glycol mix, and all air has been
bled out of the circuit.
b
The domestic hot water tank must be filled and
pressurised before the inertial storage cylinder
is filled.
PREPARING FOR INITIAL START-UP
Содержание KOMBI 1000
Страница 1: ...cod 20145353 rev 1 05 2018 KOMBI EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...
Страница 2: ...2 RANGE MODEL CODE KOMBI 800 20145308 KOMBI 1000 20145313...
Страница 23: ......