manualshive.com logo in svg
background image

5

INSTALLATION

INSTALLATION

UNPACKING THE PRODUCT

R

 

7200/3F HV PLUS

 solar heaters are supplied in a single pack-

age on a wooden pallet.

The insulation and cladding components on models 2000 and 

3000 are supplied separately from the structural parts and should 

be assembled when you receive the product, as described in the 

section "Fitting the insulation (models 2000 - 3000)".

The following items are delivered in a plastic bag inside the 

packaging:

 

− Instruction manual

 

− Bar code labels

 

− Hydraulic test certificate

 

9

The instruction manual is an integral part of the solar stor-

age cylinder. Once located, read it thoroughly and keep it 

safe.

 

9

For handling operations, thoroughly follow the instructions 

on device package label.

INSTALLING THE MAGNESIUM ANODES

Use the anodes provided; when assembling, note the position 

and lengths provided in the technical data table.

7200/3F HV PLUS 800 ÷ 1500 models

 

− Partially remove the cladding, remove the washer and 

unscrew the anode-holder plug in the sleeve using a 

spanner

 

− Insert the anode provided, tighten the anode using a 

spanner and then put the washer back in position.

7200/3F HV PLUS 2000 - 3000 models

 

− Before  fitting  the  cladding,  unscrew  the  anode-holder 

plug in the sleeve using a spanner

 

− Insert the anode provided and tighten the anode using 

a spanner.

 

NOTE: Tighten the anode plug to a torque of 25-30 Nm.

FITTING THE INSULATION (MODELS 2000 - 3000)

Once the tank is in the right position in the installation room, 

the insulation and finishing parts for the tank can be installed.

Proceed as follows:

 

− Wrap the insulation (1) around the storage cylinder, care-

fully lining up the fittings with the holes on the inside 

of the insulation. Secure the insulation in place with the 

zips (2) at the edges of the two sections

1

1

2

2

2

 

− Drill the holes in the insulation for the connectors and 

insert the washers (3)

 

− Fit the flange cover (4)

 

− Finally, fit the insulation top panel (5) and cover it with 

the thermoformed cover (6).

3

5

6

4

Installation

Содержание 7200/3F HV PLUS Series

Страница 1: ...cod Doc 0071233 rev 3 09 2017 7200 3F HV PLUS EN INSTALLATION OPERATION AND MAINTENANCE MANUAL ...

Страница 2: ... to prop erty or injury to persons or animals caused by improper in stallation adjustment maintenance or use 9 9The product must be serviced at least once a year Servicing must be arranged in advance with the R Technical Assis tance Service 9 9All servicing and repairs must be performed by a qualified heating engineer 9 9If water leaks from the storage cylinder turn off the water supply and contac...

Страница 3: ...ly water as there is a danger of freezing and over heating 0 0Do not use connections or safety devices or fittings expan sion vessels pipes insulation that are not specifically de signed and tested for use in solar water heating systems 0 0Do not allow children or infirm persons to operate the sys tem unsupervised 0 0Do not dispose of packaging material into the environment or leave it within the ...

Страница 4: ... 190 305 325 543 kg First magnesium anode Ø x length 32x700 mm Second magnesium anode Ø x length 32x400 32x700 mm Flange diameter external internal 290 220 mm Diameter length of sensor sockets 8 200 mm Sleeve for electric heating element 1 1 2 Ø Maximum operating pressure of storage cylinder 10 8 bar Maximum operating temperature 99 C Discharges according to EN 12897 2006 T 45 C am bient 20 C and ...

Страница 5: ...0 models Partially remove the cladding remove the washer and unscrew the anode holder plug in the sleeve using a spanner Insert the anode provided tighten the anode using a spanner and then put the washer back in position 7200 3F HV PLUS 2000 3000 models Before fitting the cladding unscrew the anode holder plug in the sleeve using a spanner Insert the anode provided and tighten the anode using a s...

Страница 6: ...e sure that the system is fitted with safety and con trol devices in accordance with applicable legislation and standards Make sure that the central heating circuit has been flushed out to remove all sludge and lime scale and has been vented and seal tested Make sure that a suitable water treatment system is in stalled if the quality of the supply recirculation water so demands refer to the refere...

Страница 7: ...250 1345 1455 mm D 670 760 800 820 865 mm E 600 690 730 750 795 mm F 350 350 435 410 475 mm G 240 240 280 250 190 mm H 790 790 1000 1100 1250 mm I 470 470 545 555 580 mm L 760 820 865 mm M 940 1075 1075 1085 1165 mm N 1130 1295 1290 1345 1455 mm O 1320 1610 1505 1670 1860 mm P 1510 1830 1720 1990 2265 mm Q 1810 2140 2120 2425 2700 mm Net weight with insulation 168 188 303 321 543 kg 9 9It is recom...

Страница 8: ... electricity supply ON at the mains power switch and at control panel switch if fitted 16 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heater temperature control where available to the minimum value 9 9If the temperature to which the heater is exposed can fall below 0 C...

Отзывы: