3312
4
GB
CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To get maximum output 4.6 mbar measured on the pipe coupling is necessary with combustion
chamber at 0 mbar and gas G20 - Pci = 10 kWh/m
3
(8,570 kcal/m
3
).
GAS FEEDING LINE
The gas train is supplied separately, for its adjustment see the enclosed instructions.
Gas pres
sure
mbar
4
1
2
3
5
6
10,000
20,000
30,000
40,000
50,000
kcal/h
10
30
20
40
50
kW
Output
D5058
60
0
GAS TRAIN ACCORDING TO EN 676
MULTIBLOC
CONNECTIONS
USE
TRAIN
BURNER
MBZRDLE 405 B01
Rp 1/2
Rp 1/2
Natural gas and LPG
1
–
Gas
arrival
pipe
2
–
Manual
gate
(supplied by the installer)
3
–
Gas
pressure
gauge
(supplied by the installer)
4
–
Filter
5
–
Gas
pressure
switch
6
–
Safety
valve
7
–
Pressure
governor
8
–
1
st
and 2
nd
stage adjustment valve
M1
– Gas-supply pressure test point
M2
– Pressure coupling test point
1
D5072
M2
2
3
M1
4
5
6
7
8