
20190798
40
GB
Appendix - Electrical panel layout
Wiring layout key
A1
Electrical control box
B
Filter against radio disturbance
B1
RWF50 output regulator
BA
Current input DC 4...20 mA
BA1
Current input DC 4...20 mA for remote setpoint
modification
BP
Pressure probe
BP1
Pressure probe
BR
Remote setpoint potentiometer
BT1
Thermocouple probe
BT2
Probe Pt100, 2 wires
BT3
Probe Pt100, 3 wires
BT4
Probe Pt100, 3 wires
BTEXT
External probe for climatic compensation of the
setpoint
BV
Voltage input DC 0...10 V
BV1
Voltage input DC 0...10 V for remote setpoint
modification
CN1
Ionisation probe connector
F1
Fan motor thermal relay
H
Remote lockout signal
IN
Burner manual stop electric switch
ION
Ionisation probe
K1
Clean contacts output relay, burner ON
K2
Clean contacts output relay, burner lockout
KM
Fan motor contactor
MV
Fan motor
PA
Air pressure switch
PE
Burner earth
PGMin
Minimum gas pressure switch
PGM
Maximum gas pressure switch
Q1
Three-phase disconnecting switch
Q2
Single-phase disconnecting switch
RS
Remote reset button
S1
Off / automatic / manual selector
S2
Output increase / decrease selector
SM
Servomotor
TA
Ignition transformer
TL
Limit thermostat/pressure switch
TR
Adjustment thermostat/pressure switch
TS
Safety thermostat/pressure switch
X1
Burner terminal strip
XPGM
Maximum gas pressure switch connector
XP1
Socket for kit
XRWF
Terminal strip for RWF50 output regulator
Y
Gas adjustment valve + gas safety valve
YVPS
Leak detection
control device
Содержание 20190698
Страница 2: ...Translation of the original instructions...
Страница 40: ...20190798 38 GB Appendix Electrical panel layout 0 0 1 1 2 34 5 6 7 8 5 1 9 7 6 8 7 7 7 7 6 6 0 1 0...
Страница 43: ......