RC Gate A Training
127
Slide 127
The Time Required for Transition Work
Second and following RC Gates –
continued
2 min.
(Execute
Test call)
RC Gate Removal
5
•
This is operation time only.
•
Actually, you may have to wait for hourly
polling to execute the request.
•
You can avoid to wait for hourly polling by
executing a Test Call from RC Gate A.
•
Steps 4 and 5 do not need to be performed
each time you perform this procedure for
each individual RC Gate; Instead, you can
do these steps at the end, for all RC Gates
at once.
5 min.
(Execute
Test call)
Remote Registration from
Center
(
Must be finished at least one time
to complete performing AD
)
4
•
The time required to register 100 devices at
one time is estimated as 3 min.
•
The above estimation is based on the result
of designer’s testing; it takes 13 min. of
processing time to register 500 devices at
one time.
•
This estimation is the case when no devices
failed registration.
*
10 min.
Device Registration (100
devices)
3
No.
32 min.
10 min.
Total Time
Remarks
Center
On Site
Item
For transition of the second and following RC Gates, it will take less than half the time of the original RC Gate.
It takes 13 min. of processing time to register 500 devices at one time.
So, for RC Gate A (maximum of 1000 devices), it takes up to 26 minutes.
And for RC Gate S Pro (maximum of 5000 devices), it takes up to 2 and a half
hours.
Содержание RC Gate A TTP
Страница 2: ...RC Gate A Training 2 Slide 2 Overview of the Course No additional notes...
Страница 4: ...RC Gate A Training 4 Slide 4 What is RC Gate A No additional notes...
Страница 14: ...RC Gate A Training 14 Slide 14 Installation Step 1 Customer Pre Survey No additional notes...
Страница 20: ...RC Gate A Training 20 Slide 20 Installation Step 3 Device Configuration No additional notes...
Страница 65: ...RC Gate A Training 65 Slide 65 New Features IP Address Exclusion No additional notes...
Страница 69: ...RC Gate A Training 69 Slide 69 New Features RFU Features RFU Remote Firmware Update...
Страница 77: ...RC Gate A Training 77 Slide 77 New Features Auto Call Features No additional notes...
Страница 80: ...RC Gate A Training 80 Slide 80 New Features Extended Device Search No additional notes...
Страница 83: ...RC Gate A Training 83 Slide 83 Extended Device Search 3 No additional notes...
Страница 84: ...RC Gate A Training 84 Slide 84 New Feature Ping Connection No additional notes...
Страница 86: ...RC Gate A Training 86 Slide 86 New Feature Remote Registration Improved Feature No additional notes...
Страница 90: ...RC Gate A Training 90 Slide 90 New Feature User Code Counter Service No additional notes...
Страница 101: ...RC Gate A Training 101 Slide 101 Correct Turning off Procedure No additional notes...
Страница 106: ...RC Gate A Training 106 Slide 106 Replacement Procedures No additional notes...
Страница 109: ...RC Gate A Training 109 Slide 109 Troubleshooting No additional notes...
Страница 112: ...RC Gate A Training 112 Slide 112 Migrating from RC Gate to RC Gate A Overview No additional notes...
Страница 128: ...RC Gate A Training 128 Slide 128 Migrating from RC Gate to RC Gate A Detailed Procedure No additional notes...