background image

QM
 0

92

7-

04

-1

00

1-

en

/4

-1

6

 

 

Richter Chemie-Technik GmbH

  

 

T 49 (0) 21 52 / 146- 0

  

J.P. Morgan  AG, Frankfurt/Main  ·  Kto. Nr. 6 161 507 538 (BLZ 501 108 00)

 

Otto-Schott-Straße 2

  

 

 

Telefax  + 49 (0) 21 52 / 146- 190 

BIC/SWIFT: CHASDEFX ·  IBAN Code: DE61 5011 0800 6161 5075 38

 

D-47906 Kempen 

 

 

richter-i[email protected] 

Sitz der Gesellschaft: Kempen  ·  Amtsgericht Krefeld HRB 9635

 

USt. Id. Nr. DE 811 127 054 

 

www.richter-ct.com

  

 

Geschäftsführer: 

Barbara Wladarz, Bret A. Prybylski

 

 

 
 
 
 
 
 

 

 

 

 

 
 

Richter Chemie-Technik GmbH · Postfach 10 06 09  · D-47883 Kempen 

 
 
 

 

  

08.01.2015

 

 
 

Declaration of no objection 

 
Dear Sirs, 
 
The compliance with laws for the industrial safety obligates all commercial enterprises to protect their employees 
and/or humans and environment against harmful effects while handling dangerous materials. 
The laws are such as: the Health and Safety at Work Act (ArbStättV), the Ordinance on Harzadous Substances 
(GefStoffV, BIOSTOFFV), the procedures for the prevention of accidents as well as regulations to environmental 
protection, e.g. the Waste Management Law (AbfG) and the Water Resources Act (WHG) 
 
An inspection/repair of Richter products and parts will only take place, if the attached explanation is filled out cor-
rectly and completely by authorized and qualified technical personnel and is available. 
 
In principle, radioactively loaded devices sent in, are not accepted. 
 
Despite careful draining and cleaning of the devices, safety precautions should be necessary however, the essen-
tial information must be given. 
 
The enclosed declaration of no objection is part of the inspection/repair order. Even if this certificate is available, 
we reserve the right to reject the acceptance of this order for other reasons. 
 
 
Best regards 
RICHTER CHEMIE-TECHNIK GMBH 
 

 

Содержание GR/F Series

Страница 1: ...e strictly observed before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik Gm...

Страница 2: ...ions 9 9 Maintenance 10 9 1 Dismantling 10 9 1 1 Replacing plug 10 9 1 2 Replacing seat 10 9 2 Assembly 10 10 Drawing 10 10 1 Legend 10 10 2 Sectional drawing 11 10 4 Dimensional drawing 12 Relevant d...

Страница 3: ...e with CE marking No CE marking is permissible for the sizes 15 20 and 25 the name plate therefore has no CE marking Body identification The following are visible on the body according to DIN EN 19 an...

Страница 4: ...r seats Nominal size Article No mm inch 15 20 9568 96 1011 25 1 9568 96 1001 40 1 9568 96 1002 50 65 2 9568 96 1003 80 3 9568 96 1004 100 4 9568 96 1005 Fig 1 1 4 Pressure temperature diagram 2014 68...

Страница 5: ...ining items of equipment in accordance with the German Pressure Equipment Directive DGRL for the passage of fluids in the direction of the flow arrow provided on the body and for blocking the passage...

Страница 6: ...the valve must be completely filled with medium at all times or else a potentially explosive atmosphere must be excluded by superimposing a layer of inert gas b Discharges outside the valve At the poi...

Страница 7: ...ored in a dry vibration free and well ventilated room at as constant a temperature as possible Protect elastomers against UV light In general a storage period of 10 years should not be exceeded 5 2 Re...

Страница 8: ...ection of flow must be observed when installing the valve It is indicated by a direction arrow on the valve body The closing operation is already initiated by the gravity of the closing element when t...

Страница 9: ...e pressure temperature diagram can lead to damage 7 3 Shutdown The local regulations are to be observed when dismantling the valve Prior to undoing the flange connection ensure that the plant is depre...

Страница 10: ...equired for assembling and dismantling the seat 205 The article numbers for the individual nominal sizes are listed in Section 1 3 The new seat is to be carefully protected prior to assembly The seali...

Страница 11: ...Series GR F Page 11 9550 025 en Revision 14 TM 10477 Edition 05 2022 10 2 Sectional drawing...

Страница 12: ...r flanges drilled to ASME B16 5 Class 150 DN 15 20 25 40 50 65 80 100 L 130 160 200 230 290 310 350 H 112 156 197 205 205 313 327 dimensions in mm Face to face to ANSI ISA 78 08 01 class 150 flanges t...

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ...ce GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the eakage rate La 5 10 4 mgls m according to c ause 5 2 6...

Страница 17: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 18: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 19: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 20: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: