06
Attaching the bag
1)
Open the end of the bag
and along the top section make
a lengthwise cut approximately
2 meters (7 ft.) long.
Spread open the resultant flaps
to the side
(Figs. 11 & 12).
8)
Remove the sweeper
screw extensions from their
transport location and insert
them in the main auger shafts,
not mixing left and right hand
screws. Also remove protection
grids and install (Figs. 9 & 10).
9)
The sequence is
reversed when changing back
to transport mode.
Fig.10
Fig.12
Fig.9
Fig.11
CAUTION:
Do not prolong the cut to the point where grain is filling the bag and exerting pressure. This could cause a rip that
spreads along the full length of the bag.
909
Содержание EA 910
Страница 1: ...CDDF00051A RICHIGER EA 910 UNLOADER Parts list Operator s Manual ...
Страница 3: ......
Страница 10: ...02 Dimensions in millimeters Work position Transport position 9 03 5200 2500 6705 ...
Страница 30: ...14 Lubrication chart 9 23 18 15 16 18 19 19 ...
Страница 31: ...Lubrication chart 24 17 20 21 22 17 23 ...
Страница 41: ...Notes 34 ...
Страница 43: ...Sheet N 1 PTO driveline wheels EA 910 36 ...
Страница 45: ...EA 350 EA 910 Sheet N 2 Frame 38 EA 910 ...
Страница 47: ...30 26 27 28 29 26 27 31 EA 910 Sheet Nº 3 Front end driveline main drive shaft 40 ...
Страница 49: ...1 2 3 4 5 6 8 7 9 10 11 10 16 12 11 13 14 13 14 3 15 Sheet Nº 4 Roller coupling mechanism EA 910 42 ...
Страница 55: ...7 12 15 7 2 3 4 5 1 7 8 9 10 11 6 13 14 16 17 14 Sheet Nº 7 Pivoting beam roller assy EA 910 48 ...
Страница 57: ...30 31 Sheet Nº 8 Discharge auger upper section EA 910 50 ...
Страница 61: ...Sheet Nº 10 Rear end driveline EA 910 54 ...
Страница 63: ...Sheet Nº 11 Gear case EA 910 56 ...
Страница 68: ...61 ...
Страница 70: ...Sheet Nº 13 Sweep augers EA 910 62 ...
Страница 71: ...Sheet Nº 14 Hydraulic controls EA 910 64 16 15 ...
Страница 73: ...Sheet Nº 15 Hydraulic circuit EA 910 66 ...
Страница 75: ...Notes 68 ...
Страница 76: ......