3. TRANSPORT, LAYOUT AND INSTALLATION OF THE UNIT
3.1 Trasport
All towers are easily transportable, following a pre-mounting concept in two sections.
The dimensions of the various segments are within normal vehicle limits and consequently their transport can be
effected on standard lorries.
The tower casing must always travel in a vertical position and, in the same way and the top part in a horizontal
position as shown below [Fig. 03].
[Fig. 03]
IMPORTANT WARNING NOTICE !
Precautions to be taken in the case of:
-
storage before installation
-
long plant shut-downs
Lengthy periods of storage (between several weeks and several months)
before installation of the unit or plant commissioning, or protracted inactivity
of the plant even once the unit has been installed, can give rise to humidity
or the formation of condensation inside the electric motors, inevitably
damaging them and earthing the windings at the moment of start-up.
It is therefore recommended:
-
to avoid storage of the unit outside and/or exposed to the elements
for long periods before start-up/commissioning.
-
Where its storage is necessary, place the unit in a dry, covered space
or, at least, take those same precautions for the electric motors,
removing them from the unit (or removing the entire motor-fan
assembly)
-
where present (on some motor sizes it is standard supply), connect
and activate the anticondensate heater element.