52
3. Front work equipment
S/N
Part No.
Part Name
Quantity
Remark
1
3.1
Boom
1
2
3.2
Arm
1
3
3.3
Bucket
1
4
3.4
Connecting rod
1
5
3.5
Push rod
1
6
3.6
Boom cylinder
1
7
3.7
Arm cylinder
1
8
3.8
Bucket cylinder
1
9
3.9
Medium shaft of boom
1
10
3.10
Rear shaft of arm cylinder
1
11
3.11
Front shaft of arm cylinder
1
12
3.12
Front shaft of boom
1
13
3.13
Rear shaft of bucket cylinder
1
14
3.14
Medium shaft of arm
1
15
3.15
Front shaft of bucket cylinder
1
16
3.16
Front shaft of arm
1
17
3.17
Connecting shaft between bucket and
connecting rod
1
18
3.18
Shaft locker sleeve
7
Содержание XN08
Страница 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake...
Страница 5: ...5 Section II Main performance parameters...
Страница 11: ...11 Hydraulic system structure of Rhinoceros 0 8T excavators I Rotary motor...
Страница 12: ...12...
Страница 15: ...15...
Страница 16: ...16 Section IV Schematics of main valve Reserved Steering Arm Traveling Front shovel Traveling Boom Bucket...
Страница 17: ...17 Section V Electrical system diagram...