![RHINOCEROS XN08 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/rhinoceros/xn08/xn08_operation-and-maintenance-manual_1452823032.webp)
32
Please use the genuine Rhinoceros excavator parts
Interval (h)
Check points
Abnormal
Measures
Every day
Hose surface
Hose end
Connector body
Leakage 1
Leakage 2
Leakage 3
Replace it
Replace it
Tighten or replace the
hose or O-ring
Every 250h
Hose surface
Hose end
Hose surface
Hose surface
Hose
Hose
Hose end and joint body
Crack 4
Crack 5
Reinforcing material
protruded 6
Local part protruded 7
Bend 8
Bend 9
Deformation or corrosion
10
Replace it
Replace it
Replace it
Replace it
Replace it
Change it (proper bending
radius)
Replace it
Содержание XN08
Страница 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake...
Страница 5: ...5 Section II Main performance parameters...
Страница 11: ...11 Hydraulic system structure of Rhinoceros 0 8T excavators I Rotary motor...
Страница 12: ...12...
Страница 15: ...15...
Страница 16: ...16 Section IV Schematics of main valve Reserved Steering Arm Traveling Front shovel Traveling Boom Bucket...
Страница 17: ...17 Section V Electrical system diagram...