OPERATION
FN10/FN15 NITRO 02/10
Operation Section 4-27
© 2010 Alamo Group Inc.
OPERA
T
ION
Tractor PRE-OPERATION Inspection
Tractor ID#________________
Make ____________________
Date: ________________
Shift ____________________
Before conducting the inspection, make sure the tractor engine is off, all
rotation has stopped and the tractor is in park with the parking brake
engaged. Make sure the mower is resting on the ground or securely blocked
up and all hydraulic pressure has been relieved.
Operator’s Signature:
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The flashing lights function properly
The SMV Sign is clean and visible
The tires are in good condition with proper pressure
The wheel lug bolts are tight
The tractor brakes are in good condition
The steering linkage is in good condition
There are no visible oil leaks
The hydraulic controls function properly
The ROPS or ROBS Cab is in good condition
The seatbelt is in place and in good condition
The 3-point hitch is in good condition
The drawbar pins are securely in place
The PTO master shield is in place
The engine oil level is full
The brake fluid level is full
The power steering fluid level is full
The fuel level is adequate
The engine coolant fluid level is full
The radiator is free of debris
The air filter is in good condition
DO NOT OPERATE an UNSAFE TRACTOR or MOWER
Содержание Flex 15 Nitro
Страница 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Страница 85: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Страница 93: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Страница 143: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Страница 145: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 3 2010 Alamo Group Inc MAINTENANCE...
Страница 161: ......
Страница 162: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 20 2010 Alamo Group Inc MAINTENANCE...
Страница 163: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 21 2010 Alamo Group Inc MAINTENANCE...
Страница 166: ...FN10 FN15 SOM 02 10 P N 00779794C Printed U S A FN10 FN15 NITRO HEAVY DUTY FLEX WING ROTARY CUTTER...