MAINTENANCE
FN10/FN15 NITRO 01/11
Maintenance Section 5-5
© 2010 Alamo Group Inc.
MAINTENANCE
GEARBOX ARRANGEMENTS (Secondary Gearboxes)
All Three secondary Gearboxes have the same identical parts in them for 540 or 1000 RPM and for the left,
center, or right sections. To change Gearbox from 540 to 1000 RPM, the Gear (#1) and Pinion (#2) must be
reversed. Remove the Gear from the Cross Shaft and the Pinion from the vertical Output Shaft. Install the Gear
on the vertical output shaft and the pinion on the Cross Shaft. Reassemble the Gearbox allowing.008 to.012
backlash. Repeat this procedure on all three Gearboxes. When removing the Bearings and Gears, do not
marthe Grease Seal Race. Be extremely careful when installing the Grease Seals so they will not be damaged.
Содержание Flex 15 Nitro
Страница 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Страница 85: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Страница 93: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Страница 143: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Страница 145: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 3 2010 Alamo Group Inc MAINTENANCE...
Страница 161: ......
Страница 162: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 20 2010 Alamo Group Inc MAINTENANCE...
Страница 163: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 21 2010 Alamo Group Inc MAINTENANCE...
Страница 166: ...FN10 FN15 SOM 02 10 P N 00779794C Printed U S A FN10 FN15 NITRO HEAVY DUTY FLEX WING ROTARY CUTTER...