!
WARNING
THIS UNIT MAY BE USED TO HEAT THE BUILDING OR STRUCTURE DURING
CONSTRUCTION IF THE FOLLOWING INSTALLATION REQUIREMENTS ARE
MET. INSTALLATION MUST COMPLY WITH ALL INSTALLATION INSTRUC-
TIONS INCLUDING:
• PROPER VENT INSTALLATION;
• FURNACE OPERATING UNDER THERMOSTATIC CONTROL;
• RETURN AIR DUCT SEALED TO THE FURNACE;
• AIR FILTERS IN PLACE;
• SET FURNACE INPUT RATE AND TEMPERATURE RISE PER RATING PLATE
MARKING;
• RETURN AIR TEMPERATURE MAINTAINED BETWEEN 55°F (13°C) AND 80°F
(27°C); AND
• INSTALLATION OF EXHAUST AND COMBUSTION AIR INLET HOODS COM-
PLETED;
• CLEAN FURNACE, DUCT WORK AND COMPONENTS UPON SUBSTANTIAL
COMPLETION OF THE CONSTRUCTION PROCESS, AND VERIFY FURNACE
OPERATING CONDITIONS INCLUDING IGNITION INPUT RATE, TEMPERA-
TURE RISE AND VENTING, ACCORDING TO THE INSTRUCTIONS.
4
Содержание RKKL Series
Страница 9: ...9 Illustration ST A0801 17 I FIGURE 6 ROOFCURB INSTALLATION FIGURE 5 ST A1154 02 00...
Страница 41: ...41 TABLE 9 AIR FLOW PERFORMANCE 12 5 TON 43 9 kW RKKL B120 MODELS...
Страница 45: ...45 FIGURE 21...
Страница 46: ...46 FIGURE 22...
Страница 47: ...47 FIGURE 23...
Страница 48: ...48 FIGURE 24...
Страница 49: ...49 FIGURE 25...
Страница 50: ...50 FIGURE 26...
Страница 51: ...51 FIGURE 27 RKKL SYSTEM CHARGE CHART...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...56 CM 1110...