IMPORTANT RETROFIT
VENTING INSTRUCTIONS
If this furnace is a replacement
installation,
existing vent system to be sure there
are no obstructions, blockages, or
signs of corrosion.
2. Visually inspect the venting system
3. Insofar as is practical, close all
building doors, windows and all
doors between the space where the
appliances remaining connected to
DEDICATED VENTING THROUGH
CHIMNEY WITH “B-1” VENT
4. Follow the lighting instructions.
5. Test for spillage at the draft hood
6. After it has been determined that
7. If improper venting is observed
All application and installation
instructions supplied with the power
venter must be followed.
Содержание GLH series
Страница 23: ...23 FIGURE 18 UTEC 1028 928 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION a099301...
Страница 27: ...27 BLOWER PERFORMANCE DATA GPH UPFLOW HORIZONTAL MODELS BLOWER PERFORMANCE DATA GLH DOWNFLOW MODELS...
Страница 28: ...28 BLOWER PERFORMANCE DATA GLJ DOWNFLOW MODELS ONLY BLOWER PERFORMANCE DATA GPJ UPFLOW HORIZONTAL MODELS...
Страница 33: ...33 FIGURE 29 TROUBLESHOOTING FLOWCHART continued on next page PREPURGE...
Страница 34: ...34 FIGURE 29 TROUBLESHOOTING FLOWCHART CONTINUED 92 22744 19 01...