Subsystems
CGS-240 Manual
6/15/2021
Page 55 of 148
on command input from any of the RS-232 ports. Supervisory operation such as set points (RH, dew point,
flowrate, etc.) are transmitted to the controller board via the touch monitor and PC. The job of the ECB is to accept
these set points, continuously measure the various analog and digital sensors, and control the various electro-
mechanical actuators in order to bring about and maintain the desired set point conditions.
Instrument specific configuration and calibration information, such as sensor coefficients, may also be written and
read via any of the three RS-
232 ports and resides within the ECB’s Electrically Erasable Read Only Memory
(EEPROM). All coefficients and other parameters are available via the touch monitor.
Voltage regulators on the ECB take the 24VDC input power and generate local +12VDC, +5VDC, and +3.3VDC
needed for various components on and off the board. DC power for sensors, relays, pumps, and others are
supplied directly from the ECB.
6.1.3
PRECISION TEMPERATURE MEASUREMENT BOARD, PT12
A Precision Temperature Measurement Board containing a multi-channel, 24-bit, analog-to-digital converter
measures all temperature sensors. Two of the channels are dedicated to system reference resistors. In addition to
the reference resistors, the following temperature probes are measured:
Tp
Presaturator Temperature
Ts
Saturation Temperature
Tc
Chamber Temperature
Tcl
Chamber Fluid Temperature
Tev
Expansion Valve Temperature
Tr
Refrigeration Compressor Temperature
Tpu
Access Port Upper Temperature
Tpc
Access Port Center Temperature
Tpl
Access Port Lower Temperature
All temperature sensors in the humidity generator are
100
Ω
Platinum Resistance Thermometers (PRT’s).
The board measures all thermometers using full current reversal DC pulse mode excitation. It ratio-metrically
compares these raw probe measurements to measurements of the precision reference resistors to determine their
precise resistance values.
The resistance values are then computed into individual temperatures using each probe’s specific coefficients.
The
results are provided to the ECB via an RS-232 connection on UART7. The Precision Resistance Measurement Board
requires 12 VDC which is supplied from the AD3 port of the ECB.
Figure 6.4
Содержание CGS-240
Страница 1: ...CGS 240 RH Systems LLC 1225 W Houston Ave Gilbert AZ 85233 Manual...
Страница 97: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 97 of 148 8 2 ILLUSTRATIONS Figure 8 1 CGS 240...
Страница 98: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 98 of 148 Figure 8 2...
Страница 99: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 99 of 148 Figure 8 3...
Страница 100: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 100 of 148 Figure 8 4...
Страница 101: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 101 of 148 Figure 8 5 Figure 8 6...
Страница 102: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 102 of 148 Figure 8 7 Figure 8 8...
Страница 103: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 103 of 148 Figure 8 9...
Страница 104: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 104 of 148 Figure 8 10...
Страница 105: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 105 of 148 Figure 8 11 Figure 8 12...
Страница 106: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 106 of 148 Figure 8 13 Figure 8 14...
Страница 107: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 107 of 148 Figure 8 15...
Страница 108: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 108 of 148 Figure 8 16...
Страница 109: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 109 of 148 Figure 8 17...
Страница 110: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 110 of 148 Figure 8 18...
Страница 111: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 111 of 148 Figure 8 19...
Страница 112: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 112 of 148 Figure 8 20...
Страница 113: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 113 of 148 Figure 8 21...
Страница 114: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 114 of 148 Figure 8 22...
Страница 115: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 115 of 148 Figure 8 23...
Страница 117: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 117 of 148 Figure 8 25...
Страница 118: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 118 of 148 Figure 8 26...
Страница 120: ...Drawings CGS 240 Manual 6 15 2021 Page 120 of 148...
Страница 121: ...Drawings CGS 240 Manual 6 15 2021 Page 121 of 148 Figure 9 3 Refrigeration System...
Страница 122: ...Drawings CGS 240 Manual 6 15 2021 Page 122 of 148 Figure 9 4 Pneumatic System...
Страница 123: ...Drawings CGS 240 Manual 6 15 2021 Page 123 of 148 Figure 9 5 Fluid System...
Страница 124: ...Drawings CGS 240 Manual 6 15 2021 Page 124 of 148 Figure 9 6 AC Distribution...
Страница 125: ...Drawings CGS 240 Manual 6 15 2021 Page 125 of 148 Figure 9 7 AD0 3 LVL4...
Страница 126: ...Drawings CGS 240 Manual 6 15 2021 Page 126 of 148 Figure 9 8 Power Distribution...
Страница 127: ...Drawings CGS 240 Manual 6 15 2021 Page 127 of 148 Figure 9 9 RLY 1 14...
Страница 128: ...Drawings CGS 240 Manual 6 15 2021 Page 128 of 148 Figure 9 10 PT 12 Temp Board...
Страница 129: ...Drawings CGS 240 Manual 6 15 2021 Page 129 of 148 Figure 9 11 UART 0 3...
Страница 130: ...Drawings CGS 240 Manual 6 15 2021 Page 130 of 148 Figure 9 12 Access to Presat Drain Fitting...
Страница 131: ...Drawings CGS 240 Manual 6 15 2021 Page 131 of 148 Figure 9 13 Access to Sat Drain Fittings...
Страница 132: ...Drawings CGS 240 Manual 6 15 2021 Page 132 of 148 Figure 9 14 Temperature Probes...
Страница 133: ...Drawings CGS 240 Manual 6 15 2021 Page 133 of 148 Figure 9 15 Pressure Transducers Manifold...