NMT 552-01e
8/8
2 U-bolts M6/27
8 nuts M6
4 washers 6.4
SL nut M10
Washer 10.5
Screw M10x30
SL nut M10
Washer 10.5
Screw M10x30
Fixing plate
Sway bar
(sway bar kit option for install
on pipe structure tower)
2 SL nuts M10
2 washers 10.5
2 screws M10x30
Configuration with
Kit : SMA-SKO-48-114
Typical configuration
for direct mount on
angle tower structure
±25° max
SL washer A10
Screw M10x25
SL Nut M10
Washer 10.5
Screw M10x25
Antenna
casting ring
Sway bar clamp
After sway bar
positioning torque
tighten all bolted
joints
11.
Sway bar pre-assembly
12.
Sway bar installation
(Feed system not shown)
13.
Final Check
When the installation of the antenna has been completed, it is necessary to make
sure that the installation instructions have been followed in all aspects. It is
especially important to check that all bolted joints have been greased and are torque
tightly locked.
For convenience the fixation of the sway bar on the tower structure must be done after complete
fine Azimuth & Elevation antenna alignment.
Sway bar orientation
Installation on the antenna