
NMT 552-01e
2/8
1.
Tools required for installation
(Tools are not included with antenna)
•
Hoisting device for 100 daN
•
Shackle(s), roll(s), pulley(s) and lifting accessories
•
Torque wrench from 0 to 50 Nm
•
2 strong ropes (approx. Length 1.5x tower high)
•
Wrenches for hexagon bolts :
•
1 strong rope or cable (approx. Length 2.5x tower high)
M5(8), M6(10), M8(13), M10(17)
•
Water balance, compass, cutter, tape measure
•
Key for socket screw : M3(2.5)
(values in brackets=openings of spanners)
2.
Antenna Offset
(Overview
)
Holes for feed
systems
equipped with
guy wires
Offset
right
Rotate the reflector and the
tower mount 180°
Reflector TOP mark aligned with
antenna BOTTOM
Reflector TOP mark aligned
with antenna TOP
Offset
left