
NMT 552-01e
4/8
4.
Feed Installation
(Refer to Feed Installation Instructions joined)
5.
Azimuth safety collar installation on pipe support
Note that the installation of the antenna should be accomplished by qualified personnels,
and well trained person in fair climatic conditions (In any case, always respect the safety
regulation in effect in the country).
Activities involving the use of pulleys, ropes, carabiners and others accessories to hoist antennas
and associated products are inherently dangerous. You are responsible for your own actions and
decisions. The use of hoisting systems must be done by qualified and skilled personnel.
Always use certified and controlled equipments, and be sure to respect the breaking load and the
working load limit of each element (pulleys, ropes, carabiners…).
RFS disclaims any responsibility in case of non repect of these warnings..
For an
installation
Offset Left
For an
installation
Offset Right
Minimum
free space
on pipe
above V-Bolt
345 mm
V-bolt M10
2 washers 10.5 Ø30
4 nuts M10
(Take care of the
clamp orientation)
Minimum
free space
on pipe
under V-bolt
35 mm
Minimum
free space
on pipe
above V-Bolt
345 mm
Minimum
free space
on pipe
under V-bolt
35 mm
V-bolt M10
2 washers 10.5 Ø30
4 nuts M10
(Take care of the
clamp orientation)