NMT 552-01e
6/8
7.
Antenna installation on pipe
(Feed system not shown)
8.
Azimuth fine adjustment spindle installation
Screw M10x30
Washer 10.5
SL nuts M10
Eye spindle M10x130
2 washers 10.5
2 brass nuts M10
2 V-Bolts M10
4 washers 10.5
∅
30
8 nuts M10
Antenna installation over
the pre-installed azimuth
safety collar.
Do not forget to apply « Anti Seize » installation paste on V-Bolt threads. It will insure a
correct tension for the final V-Bolts torque tightening.
Principle for
an installation
with a left offset