4 .  Thread replacement gas orifices into gas manifold . To prevent cross-threading, hand-tighten orifices into gas 

manifold until snug and then tighten one-half to one turn using wrench .

⚠ DANGER ⚠

DO NOT use an open flame to check for gas leaks.

5 .  Check all connections for gas leaks using commercial leak-detecting fluid or rich soap and water solution . Leaks 

are indicated by presence of bubbles . If leak is detected, tighten connection . If leak cannot be stopped by tightening 

connection, replace part(s) .

Conversion to LP (Propane)

⚠ DANGER ⚠

Conversion to LP (propane) gas must be performed by qualified service personnel using a factory-

supplied conversion kit. Failure to use the proper conversion kit can cause fire, explosion, property 

damage, carbon monoxide poisoning, personal injury, or death.

If LP (propane) conversion is required, convert the unit in accordance with form 

OPT-GC

 listed in 

Table 1

 . When 

conversion is complete, verify that the input rate is correct .

Dirty Filter Switch Adjustment

After the unit is started but before continuous operation, the dirty filter switch must be set as follows:
1 .  With clean filters in place, blower doors closed, and blower operating, decrease pressure setting by adjusting 

setscrew on switch (see 

Figure 46

) clockwise until indicator light is energized or setscrew is bottomed out .

2 .  At that point, adjust setscrew three full turns counterclockwise or until setscrew is top-ended .
3 .  At that setpoint, indicator light will be activated at approximately 50% filter blockage .

Table 31.  Burner Orifices

Installation 

Elevation 

(Feet (Meters))

Installation 

Location

Unit Size

Natural Gas

Propane

Orifice Size

PN

Orifice Size

PN

0–2000 

(0–610)

US

400, 600, 700, 800, 1050, 1200

#42

84437

1 .45 mm

61652

500

#44

11833

#55

11830

2001–3000 

(611–915)

US

400, 600, 700, 800, 1050, 1200

#42

84437

#54

11834

500

#45

38678

#55

11830

2001–4500 

(611–1373)

Canada

400, 600, 700, 800, 1050, 1200

#43

11828

#54

11834

500

#45

38678

#55

11830

3001–4000 

(916–1220)

US

400, 600, 700, 800, 1050, 1200

#43

11828

#54

11834

500

#45

38678

#55

11830

4001–5000 

(1221–1525)

US

400, 600, 700, 800, 1050, 1200

#43

11828

#54

11834

500

#45

38678

#55

11830

5001–6000 

(1526–1830)

US

400, 600, 700, 800, 1050, 1200

#43

11828

1 .35 mm

97360

500

#46

16590

#56

39658

6001–7000 

(1831–2135)

US

400, 600, 700, 800, 1050, 1200

#44

11833

1 .35 mm

97360

500

#47

84853

#56

39658

7001–8000 

(2136–2440)

US

400, 600, 700, 800, 1050, 1200

#44

11833

#55

11830

500

#47

84853

#56

39658

8001–9000 

(2441–2745)

US

400, 600, 700, 800, 1050, 1200

#45

38678

#55

11830

500

#48

40414

#56

39658

9001–10,000 

(2746–3045)

US

400, 600, 700, 800

#46

16590

#55

11830

500

#48

40414

#56

39658

1050, 1200

#45

38678

#55

11830

Содержание RPBL

Страница 1: ...med by a qualified installer service agency or the gas supplier Be sure to read and understand the installation operation and service instructions in this manual Do not store or use gasoline or other...

Страница 2: ...ing Model RPBL with Option AR6 or AR7 25 Evaporative Cooling Module Option AS3 AS4 AS5 or AS8 25 Discharge Air Temperature Sensor Installation 25 Venting Combustion Air Connections Model SSCBL 27 Spec...

Страница 3: ...ot and Ignition Systems 56 Burners and Carryover System 56 Dampers and Damper Controls 57 Pressure Null Switch 57 Dirty Filter Switch 57 OPERATION 57 Pre Startup Checklist 58 Startup 58 Post Startup C...

Страница 4: ...e furnaces are approved for use with either natural gas or propane The type of gas for which the furnace is equipped the correct firing rate and electrical requirements are shown on the unit s rating...

Страница 5: ...applications to supply corridor pressurization in commercial buildings such as office structures and apartment complexes The heaters are not certified as residential heating equipment and should not b...

Страница 6: ...s Connection Location See Figure 1 Approximate Distance from Inside Curb Cap on Blower End of System Unit Size 1 89 90 pouces 2261 2286 mm 400 2 103 104 pouces 2616 2642 mm 500 600 700 800 3 110 111 p...

Страница 7: ...57 D Gas Connection Location See Figure 2 Approximate Distance from Inside Curb Cap on Blower End of System Unit Size 1 89 90 inches 2261 2286 mm 400 2 103 104 inches 2616 2642 mm 500 600 700 800 3 11...

Страница 8: ...ood not be facing into the prevailing wind Hazards of Chlorine NOTE Remember chlorine is heavier than air This fact should be kept in mind when determining the installation location of heaters and bui...

Страница 9: ...or a DX or chilled water cooling coil module the module is shipped separately A drain and fill or freeze kit and a water hammer arrestor are shipped separate options for an evaporative cooling module...

Страница 10: ...lied supports If the system has a downturn plenum and or a bottom return air opening a roof curb is recommended to provide a weatherproof installation as well as more workable clearances for ductwork...

Страница 11: ...16 165 1 4 4197 170 3 4 4337 176 1 4 4477 1 3 4 4997 202 1 4 5137 CJ5 174 1 4 4426 189 1 4 4807 194 3 4 4947 200 1 4 5086 220 3 4 5607 226 1 4 5747 B All 54 1 2 1384 43 9 16 1106 49 1 16 1246 54 1 2 1...

Страница 12: ...ual within 1 8 inch 3 mm tolerance CAUTION Curb must be leveled in both directions with no twist end to end to ensure good weather tight seal between unit s curb cap and curb 4 Level curb as necessary...

Страница 13: ...ystem should be supported by two 4 4 treated wooden rails Model RPBL If considering this type of installation in snow areas it is recommended that the weather resistant 4 4 wooden rails underneath the...

Страница 14: ...ion AU11 AU12 AU13 or AU14 174 1 4 4426 189 1 4 4807 194 3 4 4947 200 1 4 5086 220 3 4 5607 226 1 4 5747 B All 54 1 2 1384 43 9 16 1106 49 1 16 1246 54 1 2 1384 49 1 16 1246 54 1 2 1384 Although dimen...

Страница 15: ...roof separately from the packaged system set on the roof curb and attached to the furnace 1 Apply furnished 1 4 inch 1 1 4 inch foam sealant tape or two 1 4 inch beads of suitable sealant to top surfa...

Страница 16: ...ion discharge dampers in option AU12 or AU14 fit in the discharge air opening The damper motor fits inside the downturn cabinet If the downturn plenum is equipped with discharge dampers field wiring i...

Страница 17: ...and Downturn Plenum Dimensions Refer to Table 12 DX COIL CABINET OPTION AU3 FOR RPBL AND SSCBL AND OPTIONS AU13 AND AU14 FOR RPBL DOWNTURN PLENUM CABINET FACTORY INSTALLED CHILLED WATER COIL CABINET O...

Страница 18: ...net Mounting Position 4 Join duct flanges a Connect one side duct connector to both top and bottom duct connectors using 14 3 4 sheet metal screws see Figure 9 DETAIL A b Install partially assembled c...

Страница 19: ...downturn plenum cabinet equipped with optional discharge dampers connect damper motor wires to terminal blocks in furnace electrical compartment as follows a Drill three 7 8 inch holes ensuring that a...

Страница 20: ...ches 102 mm from edge Drill third 7 8 inch hole at that location b On outside of furnace section where flanges were joined in step 4 locate three hole plugs and remove center plug to expose 7 8 inch h...

Страница 21: ...ls see Figure 13 DETAIL A NOTE It may be easier to slide the filler panels in place with the door panels removed 1 Install piece of insulation against inner panel of cooling coil cabinet 2 Slide fille...

Страница 22: ...led 7 Apply silicone caulking where cooling cabinet curb cap meets furnace curb cap 8 Follow instructions provided by cooling coil manufacturer to make cooling coil connections Duct Connections Figure...

Страница 23: ...sfactory heating installation The recognized authority for duct size is the Air Conditioning Contractor s Association 2800 Shirlington Road Suite 300 Arlington VA 22206 www acca org A manual covering...

Страница 24: ...o provide airtight connections Return air duct furnace connection All return air ducts should be attached and sealed to the return air flanges to provide airtight connections Return air duct grill siz...

Страница 25: ...ly and to make necessary checks and adjustments before operating the cooling module Discharge Air Temperature Sensor Installation 1 Determine distance of sensor from unit a Ensure that there is suffic...

Страница 26: ...for mixing tube and cut hole no larger than necessary d For units with sensor and mixing tube slide mixing tube see Figure 17 DETAIL A into ductwork and attach sensor e For units with sensor holder p...

Страница 27: ...se separated combustion units Do not use this concentric adapter box with any other products Installation should be done by a qualified agency in accordance with these instructions The service agency...

Страница 28: ...VERTICAL vent Follow the pipe manufacturer s instructions for joining and sealing double wall vent pipe sections To seal the joint between the terminal section of double wall vent pipe and the vent ca...

Страница 29: ...ollar of the reducer into the inner pipe of the double wall pipe until the bead of sealant contacts the inner pipe creating a sealed joint STEP 3 Spaced equally around the double wall pipe drillthrees...

Страница 30: ...centric adapter box PN 205885 is included in the vent combustion air kit Installation instructions depend on whether the vent system is horizontal option CC6 or vertical option CC2 All separated combu...

Страница 31: ...vent combustion air kit The connection requirements are the same for both vertical and horizontal systems but the length of the double wall pipe will vary When pipe diameters differ depending on dire...

Страница 32: ...c Thimble not required if wall is of non combustible construction d Flashing e Sheet metal screws tape and sealant as required Factory supplied components for installation of the vertical vent kit are...

Страница 33: ...at installation site Refer to Table 18 to ensure that location complies with minimum outdoor design temperature requirements b Select location away from fresh air intakes allowing space for concentri...

Страница 34: ...box is installed The indoor combustion air pipe will end at the box 3 Cut hole through roof for combustion air pipe a Ensure that location and orientation of concentric adapter box are correct and ma...

Страница 35: ...oint and seam using tape or sealant Figure 28 Combustion Air Pipe Installation 6 Secure concentric adapter box to underside of roof see Figure 28 CAUTION If the roof is combustible ensure that bracket...

Страница 36: ...let air pipe 7 Total is mimimum length of vent pipe section if actual piece of vent pipe is longer extend it farther above combustion air pipe do not extend it more than 6 inches 152 mm below box b En...

Страница 37: ...t as required Factory supplied components for installation of the horizontal vent kit are listed in Table 19 SECOND Install the Exhaust Vent Terminal FIRST Install Combustion Air Inlet 1 Slide the com...

Страница 38: ...ons ensure that vent terminal is level with heater mounting height c Allow downward pitch of 1 4 inch per foot 6 mm per 305 mm for condensate drain NOTE Local codes supersede all provisions in these i...

Страница 39: ...er angle of the concentric adapter box bracket has five 7 32 inch holes that allow the position of the bracket on the box to be adjusted The shorter angle has three 7 32 inch holes that allow adjustme...

Страница 40: ...NTINUED Venting Combustion Air Connections Model SSCBL Continued Horizontal Vent Terminal Option CC6 Installation Continued a Insert combustion air pipe out through wall b Secure short angles see Figu...

Страница 41: ...oward heater NOTE The double wall vent pipe does not attach to the box The installer must provide support c Connect 5 inch double wall vent pipe to 6 or 7 inch single wall or Category III vent pipe ru...

Страница 42: ...ption package PN 45021 includes the 5 inch vent cap the adapter assembly and the seal plate as shown in Figure 34 DETAIL B Remove and discard the louvered discharge grill Attach venter seal plate and...

Страница 43: ...s are made disconnect the pilot supply at the control valve and bleed the system of all air Reconnect the pilot line and leak test all connections by brushing on a soap solution Gas Supply Piping DANG...

Страница 44: ...ON CONTINUED Piping Connections Continued Supply Piping Connections Continued Figure 35 Gas Connections DETAIL A DETAIL B SSCBL OR RPBL WITH TWO FURNACE SECTIONS SSCBL OR RPBL WITH THREE FURNACE SECTI...

Страница 45: ...dian Electric Code Part 1 CSA C 22 1 Check any local ordinances or gas company requirements that apply Check the rating plate on the heater for the supply voltage and for current requirements A separa...

Страница 46: ...d separate heating and makeup air controls could include a single or two stage thermostat system switches Selectrastat freezestat discharge temperature low limit an automatic night setback device a Ma...

Страница 47: ...16 Freezestat Relay 17 Dirty Filter Pressure Switch 18 Line Voltage Connection 19 Convenience Outlet and Outlet Transformer 20 Blower Motor Contactor or Starter 21 High Ambient Limit Control and or H...

Страница 48: ...mounted on a wall or recessed Maxitrol system Control wires connected to a Selectrastat a discharge air sensor a remote temperature selector or sensor an amplifier or the valve must not be run close t...

Страница 49: ...the sensing pressure levels off If a restriction or if excessive flue length or turns cause the sensing pressure to become less than the switch setpoint the pressure switch will function to shut off...

Страница 50: ...optional variable frequency drive is ordered the motor operates on two speeds as determined by the electrical frequency High speed is used for cooling and low speed for heating 60 Hertz is the maximu...

Страница 51: ...Furnaces Ductstat Setting Temperature Selector Setting 1st 2nd 3rd 4th Staging Sequence Setpoint Differential Stage Adder Offset AG3 1 70 F 66 F high stage 70 F low stage 74 F shutdown 2 70 F 64 F 60...

Страница 52: ...3 AG9 is identified as MV 4 AG21 is identified as MV A AG39 is identified as MP 1 and AG40 is identified as MP 2 AG39 and AG40 are available only on unit size 400 AG41 is identified as MP3 and AG42 i...

Страница 53: ...ation option AG39 has a 25 100 firing range 4 1 turndown ratio Option AG41 applies to unit sizes 500 600 and 800 with two furnaces and to unit size 1200 with three furnaces The furnace closest to the...

Страница 54: ...lled in the cabinet leg see Figure 18 Although the sensor has a mixing tube at this distance from the discharge it does not receive a true mix so the temperature read by the sensor will be slightly hi...

Страница 55: ...er gear motor Replace primary manifold pressure switch YES NO YES NO YES NO YES NO YES NO NO YES YES NO Measure manifold pressure during burner cycling When the manifold pressure is BELOW 1 0 w c is t...

Страница 56: ...n controller electronically senses the pilot flame A low voltage DC electrical signal is imposed on the separate metal probe in the pilot assembly The metal probe is electrically insulated from ground...

Страница 57: ...air dampers As more pressure is required in the building the pressure null switch activates the damper motor driving the outside air damper towards the full open position and the recirculated air dam...

Страница 58: ...gas supply no change in pressure should occur over 3 minute period d If step c indicates leak locate leak by brushing soapy solution on all fittings bubbles will appear at any leaks e Repair any leak...

Страница 59: ...pped to provide safe controlled complete combustion However if the installation does not permit the burner to receive the proper supply of combustion air complete combustion may not occur The result i...

Страница 60: ...the blower speed as follows To make adjustments to units with a 5 HP motor a Shut OFF gas and electric power b Loosen belt tension and remove belt c For units with 5 HP motor 1 Loosen setscrew on side...

Страница 61: ...EW PUSH OFF HOLE Table 30 FLA of Blower Motors Open Single Speed Average Values Voltage Phase HP 1 1 1 2 2 3 5 7 1 2 10 15 20 FLA 208V 1PH 7 2 10 1 11 3 13 7 28 0 230V 1PH 6 5 9 1 10 2 12 4 26 0 32 0...

Страница 62: ...TSP3 75 0 73 75 10 75 0 73 85 12 9 Set Heat 2 controller to 36 F Set Heat 3 controller to 13 F b For Heat Stage 2 Heat Stage 3 Heat Stage 4 and Heat Stage 5 in system with three furnace sections use t...

Страница 63: ...nd 1200 with electronic modulation require a minimum of 6 IN WC natural gas supply pressure For propane gas When the heater leaves the factory the combination valve is set so that the outlet gas press...

Страница 64: ...sary If adjustment is necessary set pressure to correct settings by turning the regulator screw IN clockwise to increase pressure or OUT counterclockwise to decrease pressure Consult the valve manufac...

Страница 65: ...ease pressure setting by adjusting setscrew on switch see Figure 46 clockwise until indicator light is energized or setscrew is bottomed out 2 At that point adjust setscrew three full turns counterclo...

Страница 66: ...is permissible for liquefied petroleum gases Natural gas should not display any yellow tipping When making the adjustment close the air shutters no more than is necessary to eliminate the problem con...

Страница 67: ...omatically move to their correct positions 3 Tighten setscrew Figure 48 Damper Linkage MAINTENANCE WARNING If you turn OFF the power supply turn OFF the gas CAUTION When cleaning wearing eye protectio...

Страница 68: ...r assemblies and orifices for cleanliness Check wiring for any damaged wire replace damaged wiring refer to Electrical Connections section for wiring requirements Maintenance Procedures Combination Ga...

Страница 69: ...supply b Remove control access side panel c Disconnect any pilot lines and flame sensor leads d Mark and disconnect electric valve leads e Uncouple union in gas supply f Remove sheet metal screws in t...

Страница 70: ...d with an emery cloth and wipe off the ceramic insulator 4 Check the spark gap see Figure 50 which should be maintained to 7 64 inch for RPBL models or 0 100 inch for SSCBL models 5 After the pilot is...

Страница 71: ...acement kit PN 257472 for a unit with recycling gas control option AH2 or PN 257473 for a unit with gas control with lockout option AH3 Option codes are listed on the unit wiring diagram Figure 51 Obs...

Страница 72: ...h sides of the cabinet to provide access for inspection and cleaning Inspect the coil during routine maintenance and whenever the filters are changed Check the cooling coil for build up of debris and...

Страница 73: ...r too low Adjust gas pressure refer to Measure and Adjust Manifold Outlet Gas Pressure section 5 Kinked pilot tubing Replace tubing 6 Pilot valve does not open If 24V power is available at valve repla...

Страница 74: ...Adjusting Belt Tension section 6 Fan control improperly wired Ensure that wiring connections are in accordance with wiring diagram 7 Defective fan control Replace fan control 8 Blower set for too low...

Страница 75: ...0 20 0 23 8000 0 25 0 31 9000 0 31 0 40 10 000 0 39 11 000 0 46 12500 0 60 700 two size 350 furnaces one blower 5200 0 06 0 08 0 10 6000 0 06 0 10 0 15 7000 0 08 0 14 0 20 8000 0 10 0 18 0 27 9000 0 2...

Страница 76: ...___________ Address ________________________________________________________ ________________________________________________________ Phone ________________________________________________________ Mod...

Отзывы: