44
SSCBL-RPBL-IOM (10-22) 149159-C
INSTALLATION—CONTINUED
Piping Connections—Continued
Supply Piping Connections—Continued
Figure 35. Gas Connections
DETAIL A
DETAIL B
SSCBL OR RPBL WITH TWO
FURNACE SECTIONS
SSCBL OR RPBL WITH THREE FURNACE SECTIONS
SSCBL OR RPBL WITH
ONE FURNACE SECTION