background image

Form I-RDF, P/N 148384 (Rev 1), Page 9

Airflow

Assembled Dividers for Optional

Return Air Ductwork in the Roof Curb
Field-supplied ductwork may be either

“dropped in” from the top resting on

the top flange or be attached to the bottom

flange, using the dividers as ductwork.

Bottom

Discharge

Supply Air

Opening

(A x B)

Return

Air

Opening

(E x F)

A

C

B

D

E

F

G

H

3/4 (19)

3/4 (19)

Top View

FIGURE 7 - Divider Locations for
Bottom Ductwork Openings

NOTES:

•

Drawing is not proportional for all
sizes.

•

3/4" (19mm) measurement is the
width of the flanges where the roof
curb mates with the heater. Flange
surface must be sealed.

•

When cutting duct openings in the
roof, cut opening(s) 1” (25mm)
larger than duct size opening for
installation clearance.

9. Distribution of

Makeup Air

Makeup air can be introduced to the building either through distribution ducts
or through controlled pressurization with little or no ductwork. Makeup air
should be introduced and maintained using the lowest possible air velocity.
With ductwork distribution, this is accomplished using a multiplicity of dis-
charge openings over the greatest centerline distance. When a makeup air
system is automatically controlled to maintain a set building pressure, the en-
tering air will travel naturally toward the relief areas at the perimeter walls
using the building structure as the distribution ductwork.

Makeup air should enter at the highest point practical. By doing this, the fresh
air will entrain dust laden air at the ceiling and move it toward the point of
exhaust. Also, fresh air directed downward from the roof or ceiling will mix
with hot ceiling air resulting in improved distribution of heat in the building.

Sizes

inches

mm

inches

mm

inches

mm

A

23-11/32

593

28-13/32

722

38

965

A

B

20-1/8

511

28-11/32

720

38

965

B

C

5

127

13-15/32

342

11-19/32

294

C

D

10-1/4

260

7

178

4-5/8

17

D

E

25-1/2

648

54-11/16 1389

66-3/4

1695

E

F

11-1/2

292

17-23/32

432

20-1/16

510

F

G

11-15/32

291

8

203

10-15/32

266

G

H

11-1/32

280

11-3/32

282

17-1/4

438

H

Roof Curb Duct Opening Dimensions (± 1/8" or 3mm)

1-20, 1-40, 1-50, 1-65

2-80, 2-120

3-180, 3-260

prevent water leakage into the curb area due to blown rain and capillary
action.
Also place the foam sealant tape on the perimeter of the top surface of the
duct opening(s), being sure to make good butt joints at corners. If install-
ing ductwork from the top, it is recommended that tape be put on again
after the ductwork is "dropped in", sealing below and above the duct
flanges.

Содержание RDF 1-20-3

Страница 1: ...tem provides tempered makeup air Makeup air is defined as air that enters a building or area due to negative pressure created by an air exhaust load in excess of the volume of entering air This system...

Страница 2: ...account through standard engineering methods the structure s designed infiltration rate by providing properly sized relief openings by interlocking a powered exhaust system or by a combination of thes...

Страница 3: ...e Sensor Option AR32 Toggle Switch Option AR36 Photohelic Pressure Sensor Option AR37 Photohelic Pressure Sensor If an optional remote console is ordered these controls are mounted on the console The...

Страница 4: ...al to the width of the unit Top View Control Side Front View Rear View A Full Length of Outside of Curb Cap D Inside of Curb Cap Z Y B Cabinet Height 2 5 8 67 Control Compartment Blower Compartment Su...

Страница 5: ...88 37 1 8 44 3 16 84 13 16 45 1 2 24 1 2 10 1 2 5 7 16 14 9 32 15 5 8 21 29 32 19 1 8 2 80 3 2 120 3 88 48 11 16 68 1 4 84 13 16 69 1 2 52 16 1 4 5 5 16 10 15 16 15 1 2 27 9 32 27 7 32 3 180 3 3 260...

Страница 6: ...placed directly on a surface cross supports should be placed underneath the rails at the ends and at the cabinet joint Refer to FIGURE 4 IMPORTANT NOTE Mount an outdoor unit with a minimum of 14 clear...

Страница 7: ...8 1 7 8 48 1 7 8 48 Roof Curb Ductwork for Bottom Discharge Option AQ1 or AQ3 Roof Curb Ductwork for Optional Return Air Airflow See IMPORTANT NOTE on the left Roof Curb Dimensions for Model RDF Serie...

Страница 8: ...tolerance of 1 8 5 Level the roof curb To ensure a good weatherproof seal between the unit curb cap and the roof curb the roof curb must be leveled in both direc tions with no twist end to end Shim as...

Страница 9: ...system is automatically controlled to maintain a set building pressure the en tering air will travel naturally toward the relief areas at the perimeter walls using the building structure as the distr...

Страница 10: ...the type of construction of the roof wood joist steelbar joist steel truss pre cast concrete etc and the ceiling hung flush etc o Rectangular ducts should be constructed of not lighter than No 26 U S...

Страница 11: ...er Light and Potentiometer If ordered the optional remote console is shipped separately Re mote consoles include terminal blocks for wiring Depending on what gas control or inlet air options were orde...

Страница 12: ...normally open differential pressure switch that senses air pressure across the filter bank There are field installation procedures that must be done for the proper operation of the dirty filter indic...

Страница 13: ...valve will not open If the actual temperature of the outside air is above the setpoint on the outside air control the burner will not ignite may modulate to satisfy discharge setting would shutdown co...

Страница 14: ...t this switch The pressure null switch is Dwyer 1460 0 with a range of 01 12 w c The pressure null switch is a diaphragm operated differential pressure switch used in makeup air applications to contro...

Страница 15: ...n AR33 or AR34 and or with Gas Control Option AG37 or AG51 If the system includes Air Control Option AR33 the discharge damper is con trolled by a field supplied 0 10VDC or 4 20 milliamp signal If the...

Страница 16: ...dance with the requirements of the National Fuel Gas Code ANSI Z223 1 latest edition or CAN1 B149 1 and B149 2 Gas supply piping installation must conform with good practice and with all local codes R...

Страница 17: ...te on a natural gas pilot supply pressure of 3 5 w c or propane gas of 6 0 w c Measure both operating pressure and pilot supply pressure with the blower in operation Manifold pressure is defined as th...

Страница 18: ...ocedure in Paragraph 13 Motor Loads Use an ammeter to check motor amps Amps may be adjusted downward by reducing blower RPM or by increasing duct system static pres sure For accurate amps read the mot...

Страница 19: ...k Test Start FIGURE 26 Control Locations in the Electrical Compartment RDF Series 3 Direct Fired Systems NOTE Locations may not be identical but controls should be smilar Check Test Startup Procedures...

Страница 20: ...oIf equipped with any manually reset devices such as an optional firestat limit switch a high limit switch and or optional high gas pressure switch reset devices Check setpoint on the high ambient bu...

Страница 21: ...oosen the setscrew on the side of the pulley away from the motor c Turn adjustable half of the pulley inward to increase blower speed One turn of the pulley will change speed 8 to 10 d Tighten the set...

Страница 22: ...er 2 Model No AG3 Two Stage with Two Stage Ductstat MV 7 Serial No AG30 orAG31 Maxitrol Series 14 Outside Air Only Amplifier A1014 MV 8 Serial No AG32 Maxitrol Series 14A Outside Air Only Amplifier A1...

Страница 23: ...k the main burner inlet gas pressure If the main inlet gas pressure is lower than stated on the rating plate full burner firing rate will not be achieved Check main gas supply service regulator for ad...

Страница 24: ...irements in the installation codes and operating instructions The amount of air over the burner must be within the specified range The burner profile plates are set at the factory to match CFM require...

Страница 25: ...ate N A 2 91584 2 98764 Filter Block Off Sections N A 6 95335 6 96335 Permanent Filters 12 N A 1 87251 2 94383 Sheetmetal Screws 10 x 1 2 long Screws 1 4 20 x 5 8 long bolt type Hex Nuts 1 4 20 Keps S...

Страница 26: ...inet Post Bottom Filter Channel with Blockoff Plate assembled in 1B P N 91578 Intermediate Cabinet Post Center Channel Assy Step 1C Assemble Outer Side of Filter Rack Options AS6 and AS7 only Parts Re...

Страница 27: ...tach Assembled Cabinet Section 4 Assemble Air Inlet Hood Section P N 91569 Right Side of Hood P N 91568 Left Side of Hood Step 4A Attach Hood Sides Attach the sides to the interme diate posts and bott...

Страница 28: ...er Louver Supports Step 4E Install Louvers Parts Required Two factory assembled louver sec tions 19 screws 1 2 long and five Tinnerman clips Position one louver section in the left side of the hood at...

Отзывы: