14
Place R/H Cross Log
Onto Locating Pins
L/H Log Locating Pins
Place Middle Cross Log
Across Gap in Front Log
Place L/H Cross Log
Onto Locating Pins
Install the Ceramic Log Set
Hook the window over the top edge of the
fi
rebox and
fasten the bottom two spring-loaded bolts by pushing in
and turning 90 degrees.
If broken, the glass pane may only be replaced as a
complete window assembly unit as supplied by the
manufacturer.
Note: To remove the window, the cast iron fret and
fret retainers will need to be removed
fi
rst—see
Cast Iron Fret Installation
section.
Spring-loaded
Fastening Studs (2)
1/4 Turn
Ceramic Fuel Bed Installation
Window Re
fi
tting
Содержание RF24BN
Страница 24: ...24 Parts ...