![repabad Vision 2000 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/repabad/vision-2000/vision-2000_operating-instructions-manual_1443354015.webp)
15
Decalcification programme for all
repa
BAD steam generators with the Vision 2000
button sensor and the filling opening on the column, steam generators DE 510/DE
2000 (3 kW) and DE 3000 (6 kW)/ DE 4000 (6 kW)
The steam bath must be switched off.
-
Keep the
-
key approx. 5 seconds until
CALC
is shown on the display.
The
key flashes and the steam generator heats up.
When the display shows
FlLL
and
ACld
alternately:
Screw open the filler neck on the column and screw in the decalcification
-
tube (please refer to page 16)
Dissolve
-
8 dessert spoons
of
repa
BAD decalcification agent (art. no.. EK
500) in
1 litre of water
in a separate container and fill through the filling ope-
ning using a funnel.
Unscrew the decalcification tube and screw the filler neck closed
-
The steam bath control automatically recognises when the decalcification
agent is filled and starts the decalcification period of 12 hours. The remaining
decalcification time is shown on the display.
Once the decalcification time has expired, the steam generator is automatical-
ly rinsed with fresh water. Following this, the time is again shown on the display.
Use the
key to interrupt the decalcification process early. The steam gene-
rator is automatically rinsed with fresh water.
The steam bath can be used again until the set decalcification cycle is rea-
ched.
The stipulated steam time which is based on the water hardness area when
decalcification has been completed (12 hours)! Time spent on decalcifica-
tions (aborted) is not cumulated!