en
Fixscreen
®
Minimal - New construction IM 7
60
Note:
In addition to hooking the head box onto
the hook profile, the head box must also
be fastened at 3 additional points.
This ensures that the forces caused by
the side guiding channel are properly
absorbed.
You can secure it on the indicated drilling
line. See the drawing.
14 mm
• By using the base box M.W+
The base box M.W+ can be first fastened to the construction. You can then hook the head box
onto the provided hook.
Take into account an additional 5 mm in height for the base box profile in relation to the box.
Make sure that the head box is always supported until the head box is finally secured to the
side guiding channels using the adjustable mounting pins or until the head box is fastened on
the three additional points as described above.
1