18 

Certification for 

 

 

Initial operation

               

Subsequent operation 

 

of a REMKO air-conditioning unit / system  

 

Outdoor part

 

Indoor unit 1

 

Indoor unit 2

 

Indoor unit 3

 

Unit type:

 

 

 

 

 

Unit number:

 

 

 

 

 

Setup location:

 

 

 

 

 

Unit data according to type plate 

Name:

 

Street:

 

Postal code, city:

 

Set up by: 

Test

 

Visible check setup / assembly of outdoor part and indoor unit(s)

 

 OK

 

 problem

 

Visible check of the heat-exchanger 

 

 OK

 

 problem

 

Visible check of the connection lines (switched, damaged, bent?)

 

 OK

 

 problem

 

Visible check of the heat insulation (condensation)

 

 OK

 

 problem

 

Check of the condensation drainage (with water) incl. condensation pump (if applicable)

 

 OK

 

 problem

 

Impermeability check of the connections on the outdoor part and indoor unit(s) 

 OK

 

 problem

 

Shut-off valves on the outdoor unit open (if applicable)

 

 OK

 

 problem

 

Test run of unit operation

 

 

 

Compressor / fan [ outdoor part and indoor unit(s) ]

 

 OK

 

 problem

 

Power consumption

 

 

                         A

 

Room temperature / air outlet temperature / air intake temperature

 

 

 

Functional test of remote control

 

 OK

 

 problem

 

Comments:

 

 

 

 

 

 

 

 

 

 

 

 

Result

 

The following must be performed / measured / validated during initial operation: 

               °C /              °C /             °C  

 The room air conditioning system above was put into operation without any objections.  
 The operator has been trained and the operating instructions distributed. 
 The unit could not be put into operation due to the reasons above.

 

Company:

 

Street:

 

Postal code, city:

 

Executing company

Date 

Signature of person assembling / putting unit into operation 

Operator signature 

Содержание RKV 13 T

Страница 1: ...REMKO powerful like a bear REMKO RKV 13 T 24 T Wall Ceiling Chests Edition GB P05 Operation Technology Spare Parts...

Страница 2: ......

Страница 3: ...ctrical Connection 13 Condensation Connection 14 External Condensation Pump 15 Prior to Initial Operation 16 Initial Operation 17 Environment and Recycling 17 Customer Service and Guarantee 17 Certifi...

Страница 4: ...als Protect the indoor unit and the remote control from direct and indirect sunlight Do not expose the remote control to strong vibra tions Regularly check that condensation is not blocked from flowin...

Страница 5: ...oom 4 Timer button You can program the unit to automatically switch on or off within the next 24 hour period with the timer 5 Sleep button If the Sleep function is activated the set room tem perature...

Страница 6: ...e the COOL mode when you want to cool the room to the desired temperature Reduce the desired temperature by pressing the Temperature button in 0 5 C in crements After you hear a beep the COMP display...

Страница 7: ...room air conditioner is to be switched off at a later time press when of these buttons when the remote control is on In both operating modes 12 0H appears in the lower right hand corner of the displa...

Страница 8: ...ce left right 6 Closed the front of the unit Shutting Down the Unit Temporary shutdown 1 Switch all indoor units off using the remote control 2 Disconnect the system with the main switch or fuse prote...

Страница 9: ...batteries with the correct polarity Transmission distance too great reception blocked Is the transmission signal at a dis tance of approx 3 m when the but ton is pressed Reduce distance to under 6 m...

Страница 10: ...e line RKM Inch mm 1 4 6 35 Connection intake line RKM Inch mm 1 2 12 7 Additional amount to add 2 g m 18 15 Dehumidification capacity l h 1 0 2 0 Power supply V Hz 230 1 50 Hz supplied via outdoor pa...

Страница 11: ...blocked by furniture curtains etc Make sure that the electrical terminals have been properly attached The refrigerant lines may not be bent or pressed Protect open refrigerant lines from moisture with...

Страница 12: ...mm screws bolts as well as washers to the ceiling An incline of approx 8 mm to the connection adaptor must be maintained to ensure that the condensation can flow freely Wall mount Ceiling mount Insta...

Страница 13: ...lled The electrical installations may only be performed by author ised personnel in line with the relevant regulations Local guidelines for operation as well as the requirements es tablished by local...

Страница 14: ...information The condensation drainage line is generally placed in the same guideway as the refrigerant lines If as a result of structural design conditions it is necessary to have a different guidewa...

Страница 15: ...ed on Kondensatab laufschlauch Entl ftungsschlauch kurz Pumpe Reservoir Ansaugschlauch lang Tropfwanne Condensation drainage hose Ventilation house short Pump Collection tray Reservoir Suction hose lo...

Страница 16: ...he condensation pump Before putting the pump into operation the lines that have been laid must be checked to ensure that they are functioning properly and leakproof 1 Switch the power supply of the pu...

Страница 17: ...n mode and dehu midifying mode 6 Adjust the plate fins correctly to prevent air from be ing distributed unfavourably 7 Familiarise the operator with the system and give him the certificate for initial...

Страница 18: ...permeability check of the connections on the outdoor part and indoor unit s OK problem Shut off valves on the outdoor unit open if applicable OK problem Test run of unit operation Compressor fan outdo...

Страница 19: ......

Страница 20: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606260 E Mail info remko de Internet www remko de...

Отзывы: