15
12 Acceptance and packaging certificate
The compressor unit
is completed with a receiver ___________________ l. Serial № ________________,
electric motor ___________________ Serial № ___________________________,
upon shipment the compressor is filled at the enterprise-manufacturer with the oil of the fol-
lowing mark: _________________________________________________________________,
the compressor unit found ready for service.
Packaging was done by
_________________________
Manufacture date
"_____"__________________ 20 y.
QCD mark
________________________ Seal
REMCOMP
Republic of Belarus, 247672, Rogatschev, ul. Pushkina, b. 62,
Tel: (+375-2339) – 39474, 34394, fax (+375-2339) – 34320.
Pre-purchase preparation was done:
Date of sale
"____"__________ 20 y.
Seller’s requisites
_________________________________________
__________________________________________________ Seal
Содержание SB4/C-100.LB75
Страница 1: ...COMPRESSOR SB4 C 100 LB75 SB4 F 270 LB75 SB4 F 500 LB75 SB4 F 270 LB75V MANUAL ISO 9001 2008...
Страница 2: ...2...
Страница 16: ...16...