THERMOJET
®
G3500E SERIES
OIL PURIFIER SYSTEM
INSTALLATION AND OPERATING MANUAL
Doc #
77740123
Rev
14
Date
June 2020
Page
84
of
104
IX PARTS LIST / DRAWINGS / SCHEMATICS
NOTICE:
All electrical checks and circuit testing should only be made by a
qualified electrician
.
Before removing the cover to the controller
contact appropriate operating personnel and
obtain all required hot work permits. Ensure that
the area has been inspected and determined to
be nonhazardous. Observe all hot work permit
procedures and policies.
EXPLOSION HAZARD – Substitution
of components may impair suitability
for Class 1 Groups CD
WARNING