L540PB-2 / HZI540PB-2 Direct Vent Gas Insert
31
INSTALLATION
11)
Locate provisions in the bottom of Log 6 (see highlighted areas)
and place provisions on Log 1 and Log 5 (see darkened areas).
12)
Ensure the lower "Y" of Log 6 is correctly placed on provision on
Log 5 - see below.
13)
Locate provision on the bottom of Log 7 (see highlighted areas),
place on provision on Log 1 and in provisions on Log 2 and Log 4
(see darkened areas).
7
1
6
1
5
6
5
3
5
6
5
Final Install
Log 7 provision position on Log 4
Log 7 provision position on Log 1
7
2
4
1
7
4