background image

HZ42E Regency Horizon™ Gas Fireplace

39

INSTALLATION

GT REMOTE INSTALLATION

Note:

   DO NOT USE 4 AA batteries in the battery pack on the tray - the 

DFBC is now powered by the receiver batteries in the wall.

DFBC

 = digital fi replace burner control

1)

 

 Remove the faceplate and glass door to access to DFBC & 
battery pack tray.

2)

 

Lift DFBC and battery pack up and out.

3)

   Disconnect connector from battery holder and remove from tray – (battery 

holder is attached by Velcro to tray).

4)

   Remove the 4 AA batteries if installed, reconnect the connector to the 

battery pack and put back onto Velcro strip

5)

   Locate the DFC wire from the receiver wire harness and connect to the 

DC supply wire from the DFBC. 

HZ42E

HZ42E

HZ42STE

HZ42STE

Содержание Horizon HZ42E-LP

Страница 1: ...h any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department FPI FIREPLACE PRODUCTS INTERNATIONAL LTD 6988 Venture St Delta BC Canada V4G 1H4 918 932 Regency Horizon HZ42E Gas Fireplace 06 25 13 Owners Installation Manual www regency fir...

Страница 2: ...fireplace at the flick of a switch The model HZ42E has been approved by Warnock Hersey Intertek for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many features of your Regency Fireplace Regency Horizon Gas Insert...

Страница 3: ...allation instructions and local codes if any In the absence of local codes follow the current National Fuel Gas Code ANSI Z223 1 and the current National Electrical CodeANSI NFPA70 in the U S A and the current CAN CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22 1 in Canada This appliance comes equipped with a dedicated 8 Ground Lug for attachment of the ground wire ...

Страница 4: ... Rigid Pipe 4 x 6 5 8 29 Unit Installation with Horizontal Termination 31 4 x 6 5 8 venting 31 Unit Installation with Horizontal Termination 32 Unit installation with Vertical Termination 33 4 x 6 5 8 venting 33 High Elevation Gas Line Installation 34 Pilot Adjustment 34 Gas Pipe Pressure Testing 34 886 S I T Valve Description 34 Aeration Adjustment 34 Wiring Diagram 35 optional accent lighting Wi...

Страница 5: ... tubulure d chappement basse Grandeur de l injecteur D bit minimum selon D bit maximum selon l altitude Calorifique Calorifique é é é é é é 12 WC 2 98 kpa WC C E WC C E 19 500 Btu h 5 71 kW 24 500 Btu h 7 18 kW 10 2 49kPa 6 4 1 60kPa 53 DMS 0 4500 ft pi 0 1372m Minimum supply pressure Manifold pressure high Manifold pressure low Orifice size Minimum input Maximum input Altitude D E F A B C Side Wa...

Страница 6: ...de directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon ...

Страница 7: ...7 7 DIMENSIONS DIMENSIONS UNIT DIMENSIONS 47 1194mm 15 5 8 397mm 18 5 8 473mm 13mm 30 762mm 48 3 4 1238mm 23 5 8 600mm 14 5 32 360mm 28 7 8 733mm 1 38mm 36 914mm 12 7 8 327mm 13mm 36 7 8 937mm 1 38mm 41 3 16 1046mm 21 3 16 538mm 38 965mm ...

Страница 8: ...he absence of local codes with the current NationalElectricalCode ANSI NFPA70orCSA C22 1 Canadian Electrical Code 3 See general construction and assembly in structions The appliance and vent should be enclosed 4 This appliance must be connected to the speci fied vent and termination cap to the outside of the building envelope Never vent to another room or inside a building Make sure that the vent ...

Страница 9: ... e Faceplate f Remote Control or Wall Thermostat g Optional AC Power Adaptor 10 Wall Mounted ON OFF Switch Use the toggle wall switch supplied with the manualpackage Useofa decor switchcauses higher resistance which is a problem on gas fireplaces 11 Final check Before leaving this unit with the customer the installer must ensure that the appliance is firing correctly and operation fully explained ...

Страница 10: ...se instructions Clearance Dimension Measured From A Mantel Height min 13 330mm Top of Fireplace Opening B Sidewall on one side 8 203mm Side of Fireplace Opening C Ceiling room and or alcove 22 559mm Top of Fireplace Opening D Mantel Depth max 13 330mm 22 Above Fireplace Opening E Alcove Width 84 2134mm Sidewall to Sidewall Minimum F Alcove Depth 36 914mm Front to Back Wall Maximum G From Floor 25 ...

Страница 11: ...e 7 Combustible Material 2 0 12 6 4 8 10 12 305mm Standoff Metal Stud On Edge 0 14 Non combustible Facing To Unit Base 1 25mm 21 1 2 13 25 3 4 10 20 26 Top of Fireplace Opening Due to the extreme heat this fireplace emits the mantel clearances are critical Combustible mantel clearances from top of front facing are shown in the diagram on the right Note Ensure the paint that is used on the mantel a...

Страница 12: ...sition STANDOFF ASSEMBLY The standoffs are shipped in a flat position and must be folded into shape and attached 1 Remove the standoffs from the fireplace 2 Take each standoff and bend into the correct shape Bend up at the bend lines until the screw holes in the standoff and the pre punched screw holes on the fireplace top line up 3 Attach the standoff securely to the unit with 2 screws per stando...

Страница 13: ...ent 22 559mm Vertical rise terminating horizontal D Minimum Height to Combustibles 39 9 16 1004mm E Corner Wall Depth 51 1 2 1308 F Corner Facing Wall Width 72 7 8 1851mm G Vent Centerline Height 33 1 4 845mm H Non combustible facing height 13 330mm I Gas Connection Opening Height 2 51mm J Gas Connection Height 4 1 2 114mm K Gas Connection Inset 2 7 8 73mm L Gas Connection Opening Width 4 5 8 117m...

Страница 14: ... unit can be damaged if dropped or struck Handle with care 1 Using drywall screws secure non combustible material around unit framing and top nailing strip every 6 inches Important Note To avoid cracking the board pre drill holes prior to securing to unit framing 2 Wipe any debris dust from the non combustible material and drywall 3 Prior to securing it is mandatory to prime the facing and edges u...

Страница 15: ...inst the side and back standoffs and the stove base 4 Non combustible material ie tile slate etc may be brought up to and overlap the unit top and bottom ensuring that the maximum thickness does not go beyond the 1 1 2 as shown in the diagram below The faceplate will not be able to be mounted if finished material is beyond 1 1 2 1 Frame in the enclosure for the unit with framing material IMPORTANT...

Страница 16: ... finishing the nailing strips must be set ac cordingly so that the finished material is always at the 1 1 2 edge of the flange Finished Material Nailing Strip Position 1 2 1 1 1 2 1 1 2 0 flush Unit Nailing Strip 1 Forward Unit Nailing Strip Forward Unit Nailing Strip Flush w unit Factory Set ...

Страница 17: ...ctions 1 Remove the glass door see instructions in this manual 2 Remove the screws that hold the vent restrictor plate in place 3 Adjust the vent restrictor plate to the required vent restrictor position as per the diagrams shown 4 Once the vent restrictor plate is in the required position secure with screws VENT RESTRICTOR POSITION Vent Restrictor Set 0 Factory Set Vent Restrictor no adjustment r...

Страница 18: ...ded above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm L Clearance to a mechanical air supply inlet 3 91cm above if within 10 3m horizontally 72 1 8m 36 90cm b M Clearance above paved sidewalk or a paved driveway located on public p...

Страница 19: ... Adjustable Length 3 10 Galvanized N A N A N A 4DAL N A TC 4DLT Adjustable Length 3 10 Black N A N A N A 4DALB N A TC 4DLTB Adjustable Length 7 Galvanized N A N A 4D7A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A Extension Pipe 8 1 2 Black 46DVA 08AB N A N A N A N A N A Adjustable Length 12 Galvanized N A N A 4D12A N ...

Страница 20: ...ermination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK N A Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB SV HK N A Vertical Termination Kit Disc 4DT VKC 4DHTK 4DHTK SV FK N A FPI 946 506 P Vent Guard Optional for AstroCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adaptor Must use with all rigid piping 946 208 P Vent Guard Optional for Rise...

Страница 21: ...lbow at the flue collar when using rigid venting Note Must use optional rigid pipe adapter Part 510 994 when using Rigid Pipe Venting Systems Maintain clearances to combustibles as listed in Clearances section Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall A vent guard should be used whenever the termination is lower th...

Страница 22: ... venting systems in combination with the HZ42E Direct Vent Gas Fireplace has been tested and listed as a direct vent heater system by Warnock Hersey Intertek The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram in Exterior Vent Termination Locations section Regency Direct Vent Flex System Termination Kits includes all the parts needed to insta...

Страница 23: ...en using Rigid Vent other than Simpson Dura Vent 3 screws must be used to secure rigid pipe to adaptor This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction withDuraventDirect Vent SelkirkDirect Temp Ameri Vent Direct Venting ICC Excel Direct and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affec...

Страница 24: ...L TERMINATIONS RIGID PIPE 4 X 6 5 8 The diagrams below shows examples of horizontal termination arrangements using one two or three 90o elbows two 45o elbows equal one 90o elbow 1 A maximum of three 90o elbows are permitted not including the starting 45o elbow at the flue collar when using rigid venting 2 Minimum distance between elbows is 1 ft 305mm Maintain clearances to combustibles as listed i...

Страница 25: ...h minimum of 11 feet total vertical and maximum 9 feet total horizontal P l e a s e n o t e minimum 1 foot between90o elbows is required A 1 Max 1 Min 3 Max B 2 Max 3 Min 5 Max C 3 Max 5 Min 6 Max D 4 Max 7 Min 7 Max E 5 Max 9 Min 8 Max F 6 Max 11 Min 9 Max Horizontal Venting with Two 2 90o Elbows One 90o elbow Two 45o elbows Option H V H H1 With these options maximum total pipe length is 30 feet ...

Страница 26: ...m total pipe length is 30 feet with minimum of 12 feet total vertical and maximum 9 feet total horizontal P l e a s e n o t e minimum 1 foot between 90o elbows is required A 2 Min 1 Max 3 Min 4 Max B 3 Min 2 Max 4 Min 5 Max C 4 Min 3 Max 6 Min 6 Max D 5 Min 4 Max 8 Min 7 Max E 6 Min 5 Max 10 Min 8 Max F 7 Min 6 Max 12 Min 9 Max Restrictor Position Set 0 factory setting ...

Страница 27: ... terminations using two 90o elbows with Rigid Pipe Venting Systems Two 45o elbows equal to one 90o elbow Maximum of four 45o elbows allowed not including the starting 45o elbow at the flue collar Vent must be supported at offsets Minimum distance between elbows is 1 ft 305mm Maintain clearances to combustibles as listed in the Clearances section Horizontal vent must be supported every 3 feet Fires...

Страница 28: ...ra Vent Direct Vent American Metal Products Ameri Vent Direct Vent Security Secure Vent ICC Excel Selkirk Direct Temp AstroCapTM is a proprietary trademark of FPI Fireplace Products International Ltd Dura Vent and Direct Vent are registered and or proprietary trademarks of Simpson Dura Vent Co Inc Pipe Length Vertical Terminal Storm Collar Flashing Ceiling Firestop Adj Pipe L Vinyl S Standoff O Ri...

Страница 29: ... horizontal Please note minimum 1 foot between 90o elbows is required A 1 Min 4 Max 2 Min B 2 Min 5 Max 3 Min C 3 Min 6 Max 4 Min D 4 Min 7 Max 5 Min E 5 Min 8 Max 6 Min One 90o elbow Two 45o elbows Option H H1 V Withtheseoptions maximum total pipe length is 30 feet with minimum of 6 feet total vertical and maximum 6 feet total horizontal Please note minimum 1 foot between 90o elbows is required A...

Страница 30: ...se options max total pipe length is 30 feet with min of 11 feet total vertical and max 7 feet total horizontal Please note min 1 foot between 90o elbows is required Option V H H1 V V1 A 2 Min 3 Max 4 Min B 3 Min 4 Max 6 Min C 4 Min 5 Max 7 Min D 5 Min 6 Max 8 Min E 6 Min 7 Max 9 Min F 7 Min 8 Max 10 Min Withtheseoptions max total pipelengthis30feetwithmin of 10 feet total vertical and max 8 feet t...

Страница 31: ...ter flue collar Fasten to the outer collar only with the 3 supplied screws drilling pilot holes will make this easier 4 Level the fireplace and fasten it to the framing using nails or screws through the top and side nailing strips Diagram 1 Note Forbestresultsandoptimumperformance with each approved venting system it is highlyrecommendedtoapply Mill Pac sealant supplied to every inner pipe connect...

Страница 32: ...d for 2 x 4 or 2 x 6 walls 5 Slip the assembled liner and termination assembly through the thimble making sure the termination cap faces up there are markings on the cap that show which wayis up This will position the termination cap with proper down slope for draining water Fasten the cap to the outer wall with the 4 supplied screws 6 Pull the centre inner and outer flex liner out enough to slip ...

Страница 33: ...ully twist locked position and sealed 5 Cut a hole in the roof centered on the small drilledholeplacedintheroofinStep2 Thehole shouldbeofsufficientsizetomeettheminimum requirements for clearance to combustibles of 1 1 2 Slip the flashing under the shingles shingles should overlap half the flashing as per Diagram 3 6 Continue to assemble pipe lengths Note If an offset is necessary in the attic to a...

Страница 34: ...LINE INSTALLATION Since some municipalities have additional local codes it is always best to consult with your local authorities and the CAN CGA B149 installation code For USAinstallations follow local codes and or the current National Fuel Gas Code ANSI Z223 1 When using copper or flex connectors use only approved fittings Always provide a union so that gas lines can be easily disconnected for se...

Страница 35: ...PORTANT If the optional remote control is used the AA batteries normally installed into the battery holder must be removed The AA batteries in the receiver now operate the unit Having AA batteries in both the battery holder and receiver will damage the gas valve Electrical Connection Alternative Scheme B Power at Switch Wall Junction Box Speed Control Switch with lead wires Wire Nuts 14 AWG wire W...

Страница 36: ...36 HZ42E Regency Horizon Gas Fireplace INSTALLATION L1 Wall Mounted Switch Receptacle in Unit L2 Hot Neutral OPTIONAL ACCENT LIGHTING WIRING DIAGRAM Optional Accent Lights ...

Страница 37: ... female end tagged DC Supply on wiring harness in unit 2 Locate FCM COM connector on the Remote wire harness see manual for location in unit 3 Plug in wire adaptor to FCM COM connector be careful not WR GDPDJH HQGV 7KLV RQO WV RQH ZD R 1RW RUFH LQ ZURQJ ZD 3 Plug AC adaptor into 120V wall outlet or into 120V receptacle if LQVWDOOHG LQVLGH WKH JDV UHSODFH UHER 4 Neatly tuck any loose AC Power Adapt...

Страница 38: ...of other systems may void your warranty Theremotecontrolcomeswithahandheldtransmit ter a receiver and a wall mounting plate 1 Choose a convenient location on the wall to install the receiver and the receptacle box protectionfromextremeheatisveryimportant Run wires from the fireplace to that location Use Thermostat Wire Table GT GTM REMOTE FEATURES GTMF NOT OFFERED ON THE HZ42E Thermostat Wire Tabl...

Страница 39: ...aceplate and glass door to access to DFBC battery pack tray 2 Lift DFBC and battery pack up and out 3 Disconnect connector from battery holder and remove from tray battery holder is attached by Velcro to tray 4 Remove the 4 AA batteries if installed reconnect the connector to the battery pack and put back onto Velcro strip 5 Locate the DFC wire from the receiver wire harness and connect to the DC ...

Страница 40: ...een and White wires from the DFBC module wire harness connect the spade connectors from the receiver wire harness TH Green to DFBC Green and TH TP White to DFBC White 6 Locate the DFC wire from the receiver wire harness and connect to the DC supply wire from the DFBC 7 Remove the hi lo knob from the valve head if installed by removing 2 screws as shown below Ensure diaphragm is removed 8 Install t...

Страница 41: ... just behind and to the left of the valve on the HZ42E and to the right of the valve on the HZ42STE 14 Install the receiver in the wall or if that is not possible to the tray 15 HZ42E Only Manoeuvre the tray into the base of the unit using the stops to guide how far back the tray sits HZ42STE Only Manoeuvre the tray into the two L brackets on the backs of the front wall of the unit base HZ42E Only...

Страница 42: ...n Black Enamel panels must be inspected for scratches and dimples prior to installation All claims to be recorded at this time Claims for damage after installation will not receive consideration Use a hair dryer to remove the protective coating from the panels Toprotectthefinishduringinstallationandhandling cottongloves MUST be worn at all times while handling the panels Stainless panels will disc...

Страница 43: ... bottom cover shown below 8 Loosen the 3 screws securing burner slide burner to the left and lift out shown below 9 Remove cover plate located on the left side of the firebox floor by removing 4 screws Discard the cover plate and gasket keep the screws Bottom Faceplate Panel Cover Plate Burner Bottom Cover Plug Wiring Light Diffuser Amber Glass Faceplate Glass Door Important 120 Volt AC power is r...

Страница 44: ...f the cover plates open end up as shown below 16 Secure the light diffuser in place with the 4 screws set aside from the cover plates 17 Slide amber glass into light diffuser to reinstall 12 Remove one screw securing the socket end of the diffuser and separate the 2 parts as shown below 18 Install bulb into the socket end of assembly as shown below Note Oils from hands will shorten the life of the...

Страница 45: ...ire to ground lug located forward of the receptacle 23 Reconnect electrical supply test lights 24 Reverse steps 8 2 Ground Receptacle BULB REPLACEMENT 1 Slide out bottom faceplate panel see step 3 from previous page 2 Remove 4 screws securing light diffuser mounting plate 6 Reverse steps 3 through 1 5 Replace bulb Note Oils from hands will shorten the life of the bulbs do not handle bulbs with bar...

Страница 46: ...s Use of any other type of pebbles glass crystals or other material can create a danger and will void the warranty BURNER PACKAGES Unit Glass Crystals Stones Spa Ceramic Volcanic E18 5lbs 5lb Glass 70 spa stones or 1 Box Volcanic stones GF900C AUS 10lbs 2lbs burner 8lbs firebox 10 lb Glass 32 Volcanic Stones HZ54E 3 lbs 1 lb Glass 2 packages 140 Spa Stones 2 lb Glass 35 Ceramic Stones or 2 lb Glas...

Страница 47: ...PTO30 PTO60 Plateau Series Glass Crystals shown on Burner and Firebox Floor For Units HZI390E HZI540E DO NOT block pilot area with glass crystals Optional Spa Stones Glass Crystals shown on burner For Units HZ54E HZ42ST HZ42STE HZI234E HZ42 HZ42E HZ30E Natural River Pebbles shown surrounding the a Horizon Burner Glass Crystals shown surrounding the Burner ...

Страница 48: ...48 HZ42E Regency Horizon Gas Fireplace INSTALLATION GLASS DOOR INSTALLATION Flush Door Hook top of door onto top flange Diagram 2 Diagram 3 Diagram 1 ...

Страница 49: ...te installs on the unit with 2 slides These slides are located in the bottom of the unit already installed within the outer slide The inner slides need to be removed to install them on the brackets Glass Door Faceplate 3 Pull out inner slide from the outer slide 4 Push done on the black lever on the outside of the inner slide this will release the inner slide Pull inner slide completely out from o...

Страница 50: ...the unit See inset Push in until flush with upper faceplate Screw locations Top of lower faceplate HZ42 install slider on this side of the bracket HZ42 Install slider with flat side facing outward secure with 2 screws in locations shown HZ42ST install slider with flat side facing inwards secure with 2 screws in locations shown 7 Secure each bracket with 4 screws in locations shown below 8 Install ...

Страница 51: ...ossible that you will hear some sounds from yourgasappliance Thisisperfectlynormaldueto the fact that there are various gauges and types of steel used within your appliance Listed below are some examples All are normal operating soundsandshouldnotbeconsideredasdefects in your appliance Burner Tray The burner tray is positioned directly under the burner and is made of a different gauge material fro...

Страница 52: ...n service or maintenance can cause injury or property damage Refer to the owner s information manual provided with this appliance For assistance or additional information consult a qualified installer service agency or gas supplier AVERTISSEMENT Quiconque ne respecte pas à la lettre les instructions dans la présente notice risquede déclencher un incendie ou une explosion entraînant des dommages de...

Страница 53: ...NANCE Conduct an inspection of the venting system semi annually Recommended areas to inspect as follows 1 ChecktheVentingSystemforcorrosioninareas that are exposed to the elements These will appear as rust spots or streaks and in extreme cases holes These components should be replaced immediately 2 Remove the Cap and shine a flashlight down the Vent Remove any bird nests or other foreign material ...

Страница 54: ... it to cool down to room temperature 2 Turn off the gas supply to the unit 3 Remove the faceplate by lifting it up off the glass door 4 Remove the glass door a Remove the 3 screws shown below at the bottom of the glass door b Swingthedoorout 45o fromthebottom and lift up and out Faceplate Glass Door ...

Страница 55: ...ass door b Swing the door out 45o from the bottom and lift up and out Faceplate Glass Door 5 Remove the pilot cover as shown below 6 Lift out firebox base cover 7 Remove three screws from locations shown below to release burner Slide burner to the left to release from the orifice and lift out see inset 8 Remove the valve tray by undoing the 14 outer screws Note Some of the screws are not visible i...

Страница 56: ...sembly and reverse steps 4 Remove one screw securing the socket end of the diffuser and separate the 2 parts as shown below 3 Pull out light diffuser BULB REPLACEMENT 1 Slide out bottom faceplate panel 2 Remove 4 screws securing light diffuser mounting plate see below 5 Replace bulb Note Oils from hands will shorten the life of the bulbs do not handle bulbs with bare hands ...

Страница 57: ...6 Pilot Assembly NG 911 007 Pilot Assembly LP 8 904 593 Orifice 40 NG 904 345 Orifice 53 LP 9 948 484 Slide Hinge 904 658 Inlet Gas Flex Line SS 430 011 Flue Collar Gasket 596 047F Relief plate door 596 048 Plate Relief Gasket 596 089 Valve Tray Gasket 430 011 Inner Flue Collar Gasket 586 017F Flue Restrictor Plate 586 016F Gas line cover 596 068 Top nailing strip 596 045 Side nailing strip 596 07...

Страница 58: ...Faceplate Sunset Bronze 586 917 Faceplate Brushed Stainless 946 671 Cobalt Blue Glass Crystals 946 672 Natural River Pebbles 946 673 White River Pebbles 946 674 Ceramic Spa Stones 946 680 GT Proflame Remote Control 946 681 GTM Proflame Remote Control 946 683 GTM NG Modulator 946 684 GTM LP Modulator 910 574 GTM Wire Harness 910 576 Cover Wall Mount white 910 572 Receiver GTM SIT w Batt Cover ...

Страница 59: ...at the defective part be returned to the distributor or agent Transportation Prepaid if requested Porcelain Enamel Absolute perfection is either guaranteed nor commercially possible Any chips must be reported and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of Regency to charge for larger...

Страница 60: ...________________________________________________________ Phone ___________________________________________________________ Date Installed ______________________________________________________ Serial No __________________________________________________________ Register your Regency warranty online www regency fire com Reasons to register your product online today View and modify a list of all you...

Отзывы: