ACV40E City Series
|
41
installation
Vertical Terminations
Rigid Pipe
102mm x 175mm
• Two 45
o
elbows equal to one 90
o
elbow. Maximum of six 45
o
elbows allowed.
• Vent must be supported at offsets.
• Minimum distance between elbows is 305mm.
• Maintain clearances to combustibles as listed in the "Clearances" section.
• Horizontal vent must be supported every 0.3m.
• Firestops are required at each floor level and whenever passing through a wall.
• Must use optional rigid pipe adaptor (Part# 510-994) when using rigid pipe vent systems
Vertical Flueing with Three (3) 90
o
Elbows
One 90
o
elbow = Two 45
o
elbows.
V
H1
H
V1
Option
V
H + H1
V + V1
With these options,
max. total pipe length
is 9.1m with min.
of 3m total vertical
and max. 2.4m total
horizontal.
Please note min.
0.3m between 90
o
elbows is required.
Min.
Max.
Min.
A)
0.3m
0.6m
0.9m
B)
0.6m
0.9m
1.2m
C)
0.9m
1.2m
1.8m
D)
1.2m
1.5m
2.1m
E)
1.5m
1.8m
2.4m
F)
1.8m
2.1m
2.7m
G)
2.1m
2.4m
3.0m
Lengths do not include elbow indicated
Restrictor Set 0 - Factory Setting