130-01 Operations
Refraction Technology, Inc.
98
6.3
Acquisition Information
017:10:38:08 PARAMETERS ERASED
Indicates the existing parameter set in the DAS has been erased.
This is done before another parameter set is loaded.
017:10:38:08 PC1
Indicates the parameters for Channel 1 were received by the DAS.
017:10:38:09 PC2
Indicates the parameters for Channel 2 were received by the DAS.
017:10:38:10 PC3
Indicates the parameters for Channel 3 were received by the DAS.
017:10:38:10 PC4
Indicates the parameters for Channel 4 were received by the DAS.
017:10:38:11 PC5
Indicates the parameters for Channel 5 were received by the DAS.
017:10:38:12 PC6
Indicates the parameters for Channel 6 were received by the DAS.
017:10:38:13 PD1
Indicates the parameters for DataStream 1 were received by the DAS.
017:10:38:13 PS
Indicates the parameters for Station Name, etc. were received by the DAS.
017:10:38:14 PA
Indicates the parameters for Auxiliary Channel were received by the DAS.
017:10:38:15 PZ
Indicates the parameters for SCS Setup were received by the DAS.
Содержание 130-01
Страница 16: ...130 01 Operations Refraction Technology Inc 2 ...
Страница 54: ......
Страница 82: ...130 01 Operations Refraction Technology Inc 68 Figure 51 PTO Connector ...
Страница 87: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 73 ...
Страница 88: ...130 01 Operations Refraction Technology Inc 74 ...
Страница 89: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 75 ...
Страница 96: ......