130-01 Operations
Refraction Technology, Inc.
86
For a new installation of the RT527 go to Step 12. If an upgrade of an
RT527 go to Step 10.
5.2.1
Upgrade
10.
If an upgrade or replacement of the RT527 (Item 9 on Figure 59 on page 87) is
desired, gently lift and remove the old sensor control board (RT527) (Item 9).
11.
Install the six original #6-32 screws to secure the board stack and go to Step 14.
5.2.2
For a new installation:
12.
If adding (installation) of an RT527 (Item 9) is desired, gently attach the new
board to connector making sure the board connectors line up and fit correctly.
13.
For a new (installation) install the 6 (longer) #6-32 screws supplied with the
RT527 board.
14.
Place the O-ring in the bottom half of the case (Item 15).
Figure 59 Install O-Ring
15.
Place the completed flipped case assembly (Item 1) onto the case bottom base
(Item 15) making sure the O-ring sits in the groove of the top case as well.
Содержание 130-01
Страница 16: ...130 01 Operations Refraction Technology Inc 2 ...
Страница 54: ......
Страница 82: ...130 01 Operations Refraction Technology Inc 68 Figure 51 PTO Connector ...
Страница 87: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 73 ...
Страница 88: ...130 01 Operations Refraction Technology Inc 74 ...
Страница 89: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 75 ...
Страница 96: ......