background image

 

 

Vehicle Installation

 

 

 

   

Assembly and Installation of Load Stops

 

 

 

Step 13

: Choose a location for an assembled 

vertical support. The long leg of the base should 
point towards the inside of the truck bed. 

Step 14

: Attach clamp and tighten. 

Step 15:

 Tighten wing nut against bottom of 

clamp. 

Step 16

: Place second clamp on base and tighten. 

Place as far apart on base as possible. 

Assemble the 2 pairs of load stops as shown 

Step 17:

 Place a cross bar on top of 2 of the 

vertical supports with a knob on each side of the 
top plate on the vertical support. 

Step 18:

 Slide knobs into the corresponding slots 

on the top plate of each vertical support and 
tighten. Repeat for second cross bar. 

Top of clamp. 

Repeat 4 times. 

Step 19:

 Align holes in 

triangle with holes in 
the top of the clamp. 
Insert 3/8-16 x1.75 hex 
bolts through holes. 
Install 3/8” lock 
washers and 3/8-16 
nuts on the bolts and 
tighten. 

Bottom of clamp 

Step 20:

 

Hook the 
bottom of 
the clamp 
into the top 
of the clamp 

Step 21:

 Wrap clamp around the load bar. Install 

3/8-16 x 1.00 carriage bolt and install 3/8” lock 
washer and knob. 

Содержание Carry Power TransRACK

Страница 1: ...ar clamps No drill installation CAUTION Read understand and follow all warnings and instructions before using this product Failure to follow these directions may result in property damage serious bodi...

Страница 2: ...accessory may cause minor aesthetic damage to the vehicle exterior Cequent Consumer Products makes no claims or warrantees whatsoever as to a particular vehicle s ability to support rail mounted acces...

Страница 3: ...Supports STEP 1 Slide plastic cover over vertical support STEP 2 Slide vertical support into base STEP 3 Insert two 3 8 16 x 2 long square neck bolts through the two square holes in the back of the b...

Страница 4: ...STEP 7 Slide connecting insert into load bar section Ensure it is completely seated This may require several small taps with a hammer STEP 8 Slide connecting key into slot as shown and tighten one set...

Страница 5: ...ar on top of 2 of the vertical supports with a knob on each side of the top plate on the vertical support Step 18 Slide knobs into the corresponding slots on the top plate of each vertical support and...

Страница 6: ...l be no interference where the bolts will be placed Remove the foot from the truck and drill the 2 3 8 holes in the marked locations on the foot Mark the truck bed rails using the drilled foot as a te...

Страница 7: ...olon Ohio 44139 or any of its branches factories or authorized dealers listed in local directories Any returned Product that is replaced or refunded becomes the property of Cequent Consumer Products I...

Отзывы: