5
Vehicle Installation
Assembly and Installation of Load Stops
Step 13
: Choose a location for an assembled
vertical support. The long leg of the base should
point towards the inside of the truck bed.
Step 14
: Attach clamp and tighten.
Step 15:
Tighten wing nut against bottom of
clamp.
Step 16
: Place second clamp on base and tighten.
Place as far apart on base as possible.
Assemble the 2 pairs of load stops as shown
Step 17:
Place a cross bar on top of 2 of the
vertical supports with a knob on each side of the
top plate on the vertical support.
Step 18:
Slide knobs into the corresponding slots
on the top plate of each vertical support and
tighten. Repeat for second cross bar.
Top of clamp.
Repeat 4 times.
Step 19:
Align holes in
triangle with holes in
the top of the clamp.
Insert 3/8-16 x1.75 hex
bolts through holes.
Install 3/8” lock
washers and 3/8-16
nuts on the bolts and
tighten.
Bottom of clamp
Step 20:
Hook the
bottom of
the clamp
into the top
of the clamp
Step 21:
Wrap clamp around the load bar. Install
3/8-16 x 1.00 carriage bolt and install 3/8” lock
washer and knob.