background image

 

 

Parts Included 

 

 

 

Assembly of Vertical Supports

 

 

STEP 1

Slide plastic cover over vertical support. 

STEP 2

Slide vertical support into base. 

STEP 3

Insert two 3/8-16 x 2” long square neck 

bolts through the two square holes in the back of 
the base and through the vertical

 support. 

Содержание Carry Power TransRACK

Страница 1: ...ar clamps No drill installation CAUTION Read understand and follow all warnings and instructions before using this product Failure to follow these directions may result in property damage serious bodi...

Страница 2: ...accessory may cause minor aesthetic damage to the vehicle exterior Cequent Consumer Products makes no claims or warrantees whatsoever as to a particular vehicle s ability to support rail mounted acces...

Страница 3: ...Supports STEP 1 Slide plastic cover over vertical support STEP 2 Slide vertical support into base STEP 3 Insert two 3 8 16 x 2 long square neck bolts through the two square holes in the back of the b...

Страница 4: ...STEP 7 Slide connecting insert into load bar section Ensure it is completely seated This may require several small taps with a hammer STEP 8 Slide connecting key into slot as shown and tighten one set...

Страница 5: ...ar on top of 2 of the vertical supports with a knob on each side of the top plate on the vertical support Step 18 Slide knobs into the corresponding slots on the top plate of each vertical support and...

Страница 6: ...l be no interference where the bolts will be placed Remove the foot from the truck and drill the 2 3 8 holes in the marked locations on the foot Mark the truck bed rails using the drilled foot as a te...

Страница 7: ...olon Ohio 44139 or any of its branches factories or authorized dealers listed in local directories Any returned Product that is replaced or refunded becomes the property of Cequent Consumer Products I...

Отзывы: