www.reechcraft.com/powerlift
888-600-6160
23
SECTI
ON
2
PREPARATION & INSPECTION
8. Manual Decent Crank
- Check to be sure it is present and securely
attached (See Figure 2-5)
9. Platform and Entry Gate
- Check to be sure that the mounting pins are
not loose; platform railing is undamaged; platform retaining pin is
functioning properly; self closing slide gates are functioning properly;
no cracks or visible corrosion present. (See Figure 2-6)
Figure 2-6
- Platform Mounting and Retaining Pins
Mount Pin
Openings
Mount Pin
Openings
Input Hex
Shaft
Entry Gate
Platform
Retaining
Pin
Mount Pins
Mount
Pins
Entry Gate
www.industrialproducts.com | [email protected] | 888-243-3339