background image

www.reechcraft.com/powerlift   

888-600-6160

47

The counterweights on the base of the machine allow operation up to an 
average wind speed of 6.5 m/s. It is the operator’s responsibility to accurately 
measure the wind speed as necessary to ensure operation working limits of 
6.5 m/s or less when outdoors. Note: Measuring wind speed while working 
indoors is not required.

Measuring Wind  Speed

1.  Remove the anemometer from the  
 

protective case. (See Fig 6-1)

2.  Turn on: Press “MODE” button for 2  
 

seconds. (Fig 6-2)

3.  Test proper function by blowing gently into  
 

propeller. Be sure the propeller spins freely,  

 

the battery is charged, and wind speed  

 

readout changes as you blow.

4.  Hold the anemometer in the direction of the  
 

wind taking care not to obstruct or diminish  

 

the actual wind flow.

5.  Be sure anemometer is set to measure in 
 

m/s and to measure MAX air velocity.   

 

Refer to Fig 6-3.

6.  Measure the wind speed in meters per  
 

second. (Fig 6-2)

7.  Turn off: Press “MODE” + “SET” buttons  
 

at the same time. (Fig 6-2)

8.  Return to protective case.

Press “MODE” button more than 3 seconds 
until “m/s” starts to blink.  Press “SET” 
button to select desired air velocity unit.  
To confirm the unit, press “MODE” button.  
For setting MAX/AVG/CU mode, press 
“SET” button again and again until CU/
MAX/AVG blink, then press “MODE” button 
to confirm.
1).   The setting will be stored when you  
 

turn off the unit.  But if you change the  

 

battery, the setting will go back to the  

 

factory preset.

2).   Unit of Air velocity: m/s, Km/hr, ft/min,  
 

Knots, mph.

3).   Measuring mode: CU: current air  
 

velocity, MAX: max air velocity,  

 

AVG: Average Air Velocity

6.2

  Measuring Wind Speed

SECTION 

6

OUTDOOR USE OPTION

Figure 6-2 

Anemometer

Figure 6-3 

Changing Unit &     

                  Mode of Measure

MODE

SET

WIND 
SPEED

Beaufort scale
Air velocity

Unit of air velocity

Wind chill

Temperature unit

Temperature (Displays “Cu”  

when setting measuring mode)
Average air velocity
Max air velocity
Power

Содержание PowerLift PL50

Страница 1: ...PL50 OPERATOR S SAFETY MANUAL www reechcraft com powerlift P N 4026425...

Страница 2: ...l personal injury hazards Understand and obey all safety messages that correspond with this symbol to avoid possible injury or death INDICATES AN IMMINENTLY HAZARDOUS SITUATION AND IF NOT AVOIDED WILL...

Страница 3: ...OUR PRODUCTS HAVE BEEN INVOLVED IN AN ACCIDENT INVOLVING BODILY INJURY OR DEATH OF PERSONNEL OR WHERE SUBSTANTIAL PERSONAL PROPERTY DAMAGE OR DAMAGE TO THE REECHCRAFT PRODUCT HAS OCCURRED FOREWARD DA...

Страница 4: ...on 9 1 3 OPERATION 10 General 10 Fall Hazards 10 Electrocution Hazard 11 Tipping Hazards 12 Crushing and Collisions Hazards 14 1 4 MANEUVERING TRANSPORTING AND LIFTING 15 General 15 Additional Safety...

Страница 5: ...Upright Maneuvering 34 Tilted Over Maneuvering 34 Parking and Storage 36 VehicleTransport 36 SECTION 4 EMERGENCY PROCEDURES 37 4 1 GENERAL INFORMATION 37 Manual Descent Crank 37 Discharged Battery or...

Страница 6: ...Inspection andTrack Replacement 51 7 3 PREVENTIVE MAINTENANCE AND INSPECTION SCHEDULE 51 Inspection and Maintenance Codes 51 7 4 SERVICING AND MAINTENANCE GUIDELINES 53 General 53 Safety and Workmansh...

Страница 7: ...Mast Sections 33 3 8 Maneuvering WhenTilted Back 35 4 1 Manual Descent Crank Operation 38 4 2 Emergency Retraction System 39 5 1 Chassis Base Mast Decal Locations 42 5 2 Climbing Unit Decal Locations...

Страница 8: ...riate personal protection equipment PPE for the conditions If there are any questions regarding safety training maintenance inspection application or operation of the machine please contact ReechCraft...

Страница 9: ...o 135 F 29 C to 57 C Consult ReechCraft for operation outside of this range Machine performance may be affected in very hot or cold conditions Machine Inspection Before machine operation perform walk...

Страница 10: ...t suspended by their cord from the platform Be sure to fully lower the platform completely and shut off all power before leaving the machine No more than one person is allowed on the machine Only the...

Страница 11: ...t provide protection from contact or proximity to electrical current Maintain distance from electrical lines apparatus or any energized exposed or insulated parts according to the Minimum Approach Dis...

Страница 12: ...l be made by a qualified person in accordance with employer local or governmental requirements for work practices near energized equipment DO NOT MANEUVER MACHINE OR PERSONNEL INSIDE PROHIBITED ZONE M...

Страница 13: ...appropriate sill Do not elevate if there is a safety concern related to the stability of the bearing surface Before using the machine on floors bridges and other surfaces check allowable capacity of t...

Страница 14: ...s inside the platform railing during operation Exercise extreme caution at all times to prevent obstacles from striking or interfering with operating controls drill and persons in the platform Ensure...

Страница 15: ...back for rough terrain transport Remove drill tools and equipment from platform when transporting in a vehicle Refer to the Machine Operation section of this manual for lifting information Additional...

Страница 16: ...machine and in this manual 3 Employer and government regulations 4 Use of approved fall protection device where applicable 5 Sufficient mechanical aptitude and knowledge of the machine to recognize a...

Страница 17: ...re all illegible decals are cleaned or replaced Reference Section 5 2 Decal Contents and Location 3 Safety Service Make sure a copy of the Operator s and Safety manual is enclosed in a weather resista...

Страница 18: ...ine is exposed to harsh conditions increased use or if the machine is used in a severe manner Table 2 1 Inspection and Maintenance TYPE FREQUENCY PRIMARY RESPONSIBILITY SERVICE QUALIFICATION REFERENCE...

Страница 19: ...ook the underside of the chassis Check this area for corrosion debris and cracks NOTE The Mast and Climbing Unit should be clean and free of grease oil and dirt Do not lubricate the Mast or Climbing U...

Страница 20: ...gure 2 2 3 Mast Sections Check for cracks and corrosion Make sure the Cam Levers are not bent or misshapen and springs are functioning properly Make sure the track teeth are not worn bent or misshapen...

Страница 21: ...www reechcraft com powerlift 888 600 6160 21 SECTION 2 PREPARATION INSPECTION Figure 2 3 Climbing Unit Guide Rollers Platform Mount Opening Drive Shaft Brake Gearbox Interlock Pin...

Страница 22: ...rs Check for any debris stuck to or around the wheels or swivel mechanism Check to be sure the lock is in good working condition and that the wheels are functioning properly 7 Track Sections Check tha...

Страница 23: ...to be sure that the mounting pins are not loose platform railing is undamaged platform retaining pin is functioning properly self closing slide gates are functioning properly no cracks or visible cor...

Страница 24: ...ning properly by briefly running the drill motor in the reverse direction counterclockwise You should hear and audible buzzing sound NOTE Be sure to maintain a firm grip on the drill 3 Outrigger Inter...

Страница 25: ...www reechcraft com powerlift 888 600 6160 25 SECTION 2 PREPARATION INSPECTION Figure 2 7 Mast Connectors Cam Lever Connector Pin Opening Connector Pins Cam Lever Lock TopTermination Plate...

Страница 26: ...ork platform AWP The removable platform is mounted to an elevating climbing unit that combines up to four 4 modular mast sections that are stacked and fixed to a base mast on a movable chassis The mac...

Страница 27: ...ing Unit 2 Intermediate Mast 3 Drive Shaft Brake 4 Manual Container 5 Outrigger Socket 6 Manual Descent Crank 7 Platform 8 Gearbox 9 Platform Entry Gate 10 Platform Retaining Pin 11 Tilt back handle 1...

Страница 28: ...mode Figure 3 2 Typical Drill Motor 1 Chuck 2 Torque control cordless drill option 3 PowerTrigger 4 Speed Controller optional 5 Drill Hammer Function Selector optional 6 Direction Selector 7 Battery P...

Страница 29: ...ed by the operator Before operating the machine be sure the platform is fully lowered and all four 4 outriggers are properly installed See Figure 3 3 Be sure the machine is level and on a surface capa...

Страница 30: ...supporting the intended load directly under the desired work area 2 Connect to an appropriate power source AC connect to a grounded 15A AC power supply Be careful the extension cord remains slack at...

Страница 31: ...rection selector so the drill motor is in the forward clockwise position Hold the drill motor handle firmly push down lightly to automatically disengage the drive shaft brake and squeeze the trigger t...

Страница 32: ...TIONS ALWAYS MAINTAIN A FIRM GRIPWHEN HANDLING DANGER NOTICE CAUTION WARNING 4 With the cam lever in the down position be sure the cam lever lock springs automatically into the locked position 1 Stack...

Страница 33: ...ent power to lower the platform For emergency operation please see section 4 Emergency Procedures Figure 3 7 Separating Mast Sections 4 Carefully return to the stowed position Separating Mast Sections...

Страница 34: ...must be installed corresponding to the number of masts and elevated temporarily during maneuvering only See Figure 3 4 There can be no significant weight on the machine while it is being rolled around...

Страница 35: ...L ENSURE A FIRM GRIP WITHTWO HANDS ONTHE HANDLE AND ENSURE WEIGHT IS DISTRIBUTEDTO AVOIDTHE USER ORTHE MACHINE BEINGTHROWN BYTHE MOVING WEIGHT OFTHE MACHINE TAKE PRECAUTIONSTO AVOID MANUAL HANDLING IN...

Страница 36: ...by vehicle it should be disassembled into its major components and each component secured separately Restrain each component of the machine securely during transport When transported fully stowed the...

Страница 37: ...batteries of the cordless drill run out of sufficient charge to lower the platform THE CRANK IS DESIGNED FOR MANUAL DESCENT IN CASE OF LOSS OF POWER ONLY IT MUST NOT BE USEDTO ELEVATETHE PLATFORM OR F...

Страница 38: ...and place it inside the platform 3 Remove the manual descent crank from the mounting clip inside the platform 4 Engage the drive shaft with the manual crank 5 Push down on the top of the handle to di...

Страница 39: ...ne other personnel should deploy the Emergency Retrieval System to lower the platform and rescue the operator see Figure 4 2 Remove retraction winch from chassis Attach winch to base mast and unwind s...

Страница 40: ...nd Engineering Department 474 45th Street South Fargo ND 58103 In USA Toll Free 888 600 6160 Outside USA Phone 701 280 5900 E mail info reechcraft com Failure to notify the manufacturer of an incident...

Страница 41: ...p Hazard 4026404 B3 Anemometer Storage 4026426 B4 Serial Number PLATFORM No Type ReechCraft Part Number C1 Platform Rating 4026423 C2 Crush Hazard 4026003 C3 Read Manual 4026005 C4 Platform Step Warni...

Страница 42: ...PowerLift by ReechCraft 42 Figure 5 2 Climbing Unit Decal Locations Outdoor Only See Section 6 B1 B4 B2 B3 Figure 5 1 Chassis Base Mast Decal Locations SECTION 5 GENERAL SPECIFICATIONS A3 A1 A4 A2...

Страница 43: ...reechcraft com powerlift 888 600 6160 43 SECTION 5 GENERAL SPECIFICATIONS Figure 5 3 Platform Decal Locations C5 C10 C7 C9 C11 C6 C4 C8 C1 C12 C2 C3 INSIDE Figure 5 4 Outrigger Decal Locations D1 D2...

Страница 44: ...m x 89 mm Drive Worm Drive with Integrated Drive Gear Brake A Stowed Length 1356 mm B Stowed Width 762 mm C Stowed Height 1 741 mm D Minimum Platform Height 329 mm E Outrigger Footprint Width 1705 mm...

Страница 45: ...www reechcraft com powerlift 888 600 6160 45 SECTION 5 GENERAL SPECIFICATIONS Figure 5 5 Machine Specifications A B C D E F G H J I...

Страница 46: ...see Fig 6 1 The Outdoor Use Option includes counterweights fastened to the base frame for additional stability and an anemometer to measure wind speed while working outdoors See Fig 6 1 for location...

Страница 47: ...AX air velocity Refer to Fig 6 3 6 Measure the wind speed in meters per second Fig 6 2 7 Turn off Press MODE SET buttons at the same time Fig 6 2 8 Return to protective case Press MODE button more tha...

Страница 48: ...ges without prior notification Contact ReechCraft for updated information MODIFICATION OFTHE MACHINEWITHOUTTHE MANUFACTURERS APPROVAL IS A PROHIBITED PRACTICE AND A DIRECT SAFETY VIOLATION Your safety...

Страница 49: ...R ENTAGLED INTHE MACHINE OBSERVE UNDERSTAND AND OBEY ALL DANGER WARNING CAUTION AND OTHER INSTRUCTIONS ONTHE MACHINE AND IN OPERATORS MANUAL KEEP STANDING SURFACES AND HAND HOLDS FREE OF GREASE WATER...

Страница 50: ...Inspection It is the operators responsibility to perform a Pre Start Inspection of the machine prior to use Reference Section 2 in this manual for Pre Start Inspection procedures This manual must be r...

Страница 51: ...lowing table The table is divided into two parts AREA and INTERVAL The component or function to be inspected are listed in the AREA column and the interval at which time they are to be inspected are l...

Страница 52: ...3 5 1 3 5 7 Gearbox 3 7 9 3 7 9 1 3 7 9 Manual Crank 1 1 12 1 3 12 Climbing Unit 7 1 7 1 3 5 10 7 Platform 1 4 5 1 4 5 1 3 4 5 7 Platform Latch 1 4 7 8 1 3 4 6 7 8 1 3 4 6 7 8 Chassis 3 4 5 3 4 5 3 4...

Страница 53: ...g components and pinch points Do not allow heavy objects to rest in an unstable position When raising a portion of the machine ensure that adequate support is provided Cleanliness The single most impo...

Страница 54: ...nd evenly If there are any air bubbles work them gently towards the edge with a clean cloth Pressure sensitive adhesives reach full strength after several days MAST SECTIONS SHOULD BE INSPECTED EVERY...

Страница 55: ...operly at the joint location If the track is bent or damaged in any way it must be replaced by a qualified mechanic before machine use may resume 3 Mast Connector Wear MastTrack misalignment may be du...

Страница 56: ...PowerLift by ReechCraft 56 SECTION 7 SERVICE MAINTENANCE MACHINE LOG RecordType 1 Examination 2 Test 3 Major Alteration 4 Repair Information Date RecordType Notes...

Страница 57: ...the applicable corrective action The probable causes and corrective action should where possible be checked in the order listed in the tables It should be noted that there is no substitute for thorou...

Страница 58: ...rm One or more of the connector lock levers are in the open position interfering with the rollers Lower the platform to expose the last section of mast that was installed and check to be sure both lev...

Страница 59: ...cate Number 39323 20121030 The above products have been evaluated for conformity with provisions of following European Directives Directive 2006 42 EC of the European Parliament and of the Council of...

Страница 60: ...ReechCraft Inc P O Box 2426 Fargo ND 58108 888 600 6160 www reechcraft com powerlift...

Отзывы: