15
ROOF VENT ASSEMBLY
The roof vent pack has 5 pieces of aluminium: and from the main box of fittings you require 1.83m of glazing beading, 4x nuts
and bolts, 2x casement stay pins, 1x casement stay and 6x M4 stainless steel nuts and bolts.
PROCEDURE:
1.
Identify the slam bar and attach the 2 stay pins to the outer side of the angle using the M4 stainless steel nuts and bolts.
2.
Lay the 4 edge pieces of the vent on a level surface as though you were on the inside of the vent (with the bolt slots of the
sidebars uppermost and the ‘v’ slots of the bottom rail uppermost. The top rail is arranged in such a way that the squared
off end is to the bottom and the hooked hinge uppermost).
3.
Slide the glazing beading into the slots in the side and top rails and trim to suit.
4.
Insert a bolt into each end of the side rail bolt slots, put these bolts through the holes in the top and bottom rails, add nuts
and lightly tighten. Check that all joints are secure and that the vent is square, and then tighten up the nuts.
5.
Fit the casement stay using the M4 stainless steel nuts and bolts, putting the bolts through the holes in the saddle of the
stay and through the 2 elongated holes in the bottom rail. Hold the nuts in place and tighten the bolts with a screwdriver.
Do the same with the other vents.
Содержание Urban Series
Страница 2: ...2 18 25 22 21 39 17 36 31 29 28 24 23 30 36 33 32 31 30 30 30 35 19 34 ...
Страница 3: ...3 12 6 42 15 5 16 41 1 2 3 9 10 11 4 14 ...
Страница 12: ...12 DOOR END ASSEMBLY Viewed from inside ...
Страница 16: ...16 ASSEMBLY OF GREENHOUSE UNIT ...
Страница 24: ...24 ...