Red Jacket 344-001-5 Скачать руководство пользователя страница 3

Table of Contents

1

Introduction 

Safety Precautions ............................................................................................................1
Warnings and Instructions  ................................................................................................2

Important Safety Information ....................................................................................2
Preliminary Precautions............................................................................................2
Requirements For Use .............................................................................................3
Operating Precautions..............................................................................................3

Replacing The Quad Seal 

Removing the Pump  .........................................................................................................4

Replacing the Functional Element 

Adjusting the Functional Element  .....................................................................................9

To Adjust the Relief Pressure...................................................................................9
Functional Element Parts List.................................................................................11

Figures

Figure 1.

Electronic Line Leak Detector

.................................................................4

Figure 2.

Packer

.....................................................................................................4

Figure 3.

Locating 7” Packer O-Ring And Quad Seal

............................................6

Figure 4.

Installing New Quad Seal

.......................................................................6

Figure 5.

Functional Element

.................................................................................8

Figure 6.

Functional Element Cap And Pressure Adjustment Screw

.....................9

Tables

Table 1.- 

Approximate Pressures At Shut-Off  ........................................................10

Table 2.- 

Adjustable Precision Functional Element AG (P/N 323-002-5)  ...............11

Содержание 344-001-5

Страница 1: ...Installation Guide 4 AG Pump Service Kit Manual No A042 078 Revision E Part No 344 001 5...

Страница 2: ...f any damages and or shortages within 30 days of receipt of the shipment as stated in our Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Fax Bill of Lading to V R Customer Service at 800 234 5...

Страница 3: ...justing the Functional Element 9 To Adjust the Relief Pressure 9 Functional Element Parts List 11 Figures Figure 1 Electronic Line Leak Detector 4 Figure 2 Packer 4 Figure 3 Locating 7 Packer O Ring A...

Страница 4: ...ask someone who does WEAR EYE PROTECTION Wear eye protection when working with pressurized fuel lines or epoxy sealant to avoid possible eye injury WARNING This product operates in the highly combust...

Страница 5: ...Prevent Explosions and Fires Fuels and their vapors will explode or burn if ignited Spilled or leaking fuels cause vapors Even filling customer tanks will cause potentially dangerous vapors in the vic...

Страница 6: ...A OSHA regulations and federal state and local fire codes and other applicable local regulations The selection of any Veeder Root product must be based upon physical specifications and limitations and...

Страница 7: ...the pump close it 2 If an electronic line leak detection transducer is installed it must be removed from the leak detector port following instructions in the appropriate Line Leak installation manual...

Страница 8: ...ld remove the old quad seal from the base of the packer under the line leak port see Figure 3 9 Clean the seating surface and the sealing surface of the quad seal 10 Lubricate the quad seal with petro...

Страница 9: ...anifold Discharge Port 7 O Ring Packer Seal 7 O Ring Packer Seal Manifold Functional Element Functional Element Packer Packer Leak Detector Port Plug or Line Leak Detector Leak Detector Port Plug or L...

Страница 10: ...lb 40 61 N m NOTE suggested tools non sparking include a 3 4 wrench pipe wrench 1 4 Allen wrench 9 16 wrench screw driver wire cutter and wire stripper 20 If applicable open ball valve down line from...

Страница 11: ...gure 5 Functional Element 5 Carefully lift the functional element and remove it from the packer The old check valve and spring will be resting inside the packer NOTE The check valve and spring should...

Страница 12: ...s fully down the relief pressure is approximately 30 psi 207 kPa Fully up will result in relief pressures between 0 3 psi 0 20 kPa 3 Lubricate the cap s o ring with petroleum jelly and replace cap by...

Страница 13: ...with the dispenser furthest from the pump and work toward the pump 5 Pump start up is now complete Table 1 Approximate Pressures At Shut Off Pump Approximate Shut Off Pressure AGUMP33R1 UMP33R1 25 ps...

Страница 14: ...Casting 2 017 526 1 Diaphragm 3 066 883 1 Poppet 4 072 641 1 O Ring 41 64 x 5 64 5 076 421 3 Adjustment Screw 6 012 956 3 Cap 7 080 767 1 Spring 8 066 620 1 Plug 9 060 332 1 Seal 10 012 965 3 Top Cast...

Страница 15: ...For technical support sales or other assistance please visit www veeder com...

Отзывы: