Assembly
Completing the forestay (R5 – R7)
28
2.
Drill a hole of diameter 5.2 mm through the furling section and the top bushing half on each side
of the furling section using a drilling bit.
3.
Take the top bushing halves out of the furling section and cut an M6 thread in each drill hole.
4.
Stow the top bushing halves for later assembly.
5.
Drill holes of diameter 6 mm in the furling section.
Содержание RF90
Страница 4: ...Notes www reckmann com ...
Страница 74: ...Notes 70 ...