Part Name

Material

Specification

bolt

aSTM F593 (stainless steel)

1/4” x 20 - 5/8”

Flange Nut

aSTM F594 (stainless steel)

1/4” x 20 

When using mounting holes, fixings must be fastened to 9 ft-lbs (12 Nm) of torque and installation must be according to fig. 6.

Install the above parts as shown in fig. 6.  Consult the Unirac Code Compliant Installation Manual for further details where necessary.  For 

areas where discrepancy may exist, this installation manual shall take precedence.

iii)  mounting holes

Mounting utilizing the four elongated holes (0.26 x 0.43 in (6.6 x 11 mm)) on the underside of the panel frame (at a distance of 17.72 in (450 mm) from 

the midpoint of the long side) have been found to comply with UL 1703 requirements for a maximum design load of 75.2 lbs/ft² (3600 Pa) (fig. 5).
when mounting using mounting holes, the frame and panel edge must be supported by two transverse rails (fig. 1), of aluminium or galvanized steel 

to avoid galvanic corrosion and be appropriate for the local environment.  These must be held in position by bolts and flange nuts according to the 

specifications below.  if bought in a kit, do not use the washers and bottom mounted clips provided if they do not match the specifications below:

Mounting holes

Fig. 5:  Mounting holes

Fig. 6:  Mounting using  

mounting holes

38

GR

GR

GR

GR

28

1665±2,5

900

382,5

950

991±2,5

17

45

11±0,2

6,6±0,2

20,5±0,5

vii)   short side mounting using clamps

Mounting utilizing clamps on the two short sides of the panel have been found to be in compliance with UL 1703 requirements for a maximum design 

load of 33.4 lbs/ft² (1600 Pa) (fig. 9).

• 

Fix the panels so that the lower short side of the frame is supported by the mounting structure (to reduce risk of damages due to sliding snow load).

• 

Clamps must be secured between a distance of 4.9 and 9.8 inches (125 – 250 mm) from the panel corner to the clamp edge.

• 

Tightening torque must be tightened to 16 ft-lbs (21.7 Nm).

• 

The minimum distance between the end clamp and the end of the rail is 1 in (25 mm).

• 

Mechanical load must not exceed 33.4 lbs/ft (1600 Pa).

• 

The overlap between support rail and frame must be a minimum of 1/4 in (6 mm).

In areas of snow build-up, panels can be subjected to forces in excess of the stated limit even when snow depth does not appear extreme, 

causing damage to the framework.  If the installation is likely to be affected, further suitable panel support is recommended on the lower 

row of panels.

Ensure the drainage holes are not covered by the mounting structure.

vi)  long side mounting using clamps

Mounting utilizing clamps on the two long sides of the panel have been found to be in compliance with UL 1703 requirements for a maximum design 

load of 75.2 lbs/ft² (3600 Pa) (fig. 8).

• 

Clamps must be secured between a distance of 8.2 in to 16.4 in (208 mm - 416 mm) from the corner of the panel (measured from the mid-point) 

to the clamp edge.

• 

Tightening torque must be tightened to 9 ft-lbs (12 Nm).

• 

The distance between the end clamp and the end of the rail must be minimum 1 in (25 mm).

Fig. 8:  Long side mounting

Fig. 9:  Short side mounting

8.2”-

16.4”

1”

1”

4.9”-

9.8”

Содержание REC265 Series

Страница 1: ...Installation manual rec TwinPeak SERIEs FortheinstallationofRECTwinPeakSeriessolarpanels certifiedaccordingtoUL1703 ...

Страница 2: ...on 4 ii Specific hazards of DC electricity 4 iv Safetyrequirements 4 MECHANICAL INSTALLATION 5 FIRE GUIDELINES 5 ORIENTATION 5 ENVIRONMENTAL FACTORS 5 Panel HANDLING 5 MOUNTING the panels 6 Panel Installation 6 i Rail specifications 6 ii Clamp Specification 6 iii Mounting holes 7 iv Slide in Systems 7 v Drainage holes 7 vi Long side mounting using clamps 8 vii Shortside mounting using clamps 8 vii...

Страница 3: ...hich highlight important information or notes Indicates potential for damage to the array or property or personal safety Indicates important notes on best practice to help with the installation or to avoid potential damage to the panels array or property For further information on installation procedures please call your distributor or contact your local REC Solar office Details available at www r...

Страница 4: ...outputs In installations not under the requirements of the NEC the values of ISC andVOC marked on the panels must be multiplied by a factor of 1 25 when determining component voltage ratings conductor ampacities overcurrent device ratings and size of controls connected to the PVoutput SAFETY Measures Wiring installation shall be in accordance with the NEC or CSA C22 1 Safety Standard for Electrica...

Страница 5: ...it can be easily accessed in the event of a building fire Check with local authorities for applicable regulations concerning setbacks or other placement restrictions that may apply for roof mounted arrays The use of DC ground fault interrupters is recommended This may also be required by local and national codes All electrical appliances are a fire risk The panel should therefore be mounted over a...

Страница 6: ...ling load Fig 2 Rail specification C channel rail H channel rail The clamps should be fastened to C or H channel rails fig 2 Thickness of walls for mechanical connections min 0 156 in 4 0 mm Thickness of walls exposed to buckling load min 0 08 in 2 0 mm Moment of Inertia for profile area about X X min array mounting diagram 0 4 in4 19 2 cm4 The overlap between support rail and the outer edge of th...

Страница 7: ...g clamps Mounting utilizing clamps on the two short sides of the panel have been found to be in compliance with UL 1703 requirements for a maximum design load of 33 4 lbs ft 1600 Pa fig 9 Fix the panels so that the lower short side of the frame is supported by the mounting structure to reduce risk of damages due to sliding snow load Clamps must be secured between a distance of 4 9 and 9 8 inches 1...

Страница 8: ...ls are preferred however galvanized or hot dipped zinc plated fasteners are equally suitable Grounding cable Star washer Grounding lug dimensions and wire fastening torque for GBL 4DBT Fig 7 Drainage holes v Drainage holes There are eight drainage holes 0 47 x 0 30 in 12 x 7 5 mm in the panels frame each spaced 2 2 in 55 mm from the corner of the panel frame fig 5 This allows water caused by rain ...

Страница 9: ...cal integrity of the cables is intact Bonding points to ground are tight secure and free from corrosion which could break the continuity between the panels and ground Recycling REC has made every effort to ensure panel packaging is kept to a minimum The paper and cardboard packaging can be recycled and the protective wrapping and panel separating blocks are also recyclable in many areas Please rec...

Страница 10: ...nder standard test conditions STC Values at STC airmass AM 1 5 irradiance 1000 W m cell temperature 25 C 77 F At low irradiance of 200 W m AM 1 5 and cell temperature 25 C at least 94 of the STC panel efficiency will be achieved followed by TP TP BLK TP ECO Fig 12 Panel dimensions in Dimensions 65 55 x 39 02 x 1 5 in Area 17 76 ft Weight 39 6 lbs Operational Temperature 40 185 F 40 85 C Maximum Sy...

Страница 11: ...10 A First release 12 2014 A 2 Update to Electrical data STC 275 Wp IMPP 12 2014 A 3 Update to Electrical data STC addition of 260 280 Wp revision of low light behavior data in Electrical Data 03 2015 B Updated to include information on panel variants ...

Страница 12: ...RECSolarPte Ltd 20TuasSouthAvenue14 Singapore637312 Singapore Tel 6564959228 Mail post recgroup com www recgroup com ...

Отзывы: