6.11 NORMAL START-UP
The start-up procedure is indicated below. The flow diagram shows the
variables based on the characteristics of the machine and the water
circuit.
During start-up, it’s essential that the plant water temperature
stabilizes to the set point value before activating CCUs.
1. Check that CCUs are OFF (fans OFF)
Is the machine
equipped
with the water
pumping
unit (optional)?
NO
YES
NO
Is the water circuit
divided into primary
and secondary
circuit?
YES
NO
Is the water circuit
divided into primary
and secondary
circuit?
YES
2.
Start the circuit’s
pump
2.
Start the primary
circuit’s pump
2.
Start the machine
2.
Start the machine
3.
Wait for at least 1 min
and start the
machine.
3.
Wait for at least 1 min
and start the machine
3.
Wait until the circuit
reaches the set point
temperature
3.
Wait until the primary
circuit reaches the set
point temperature, then
start the secondary
circuit’s pump
4.
Wait until the circuit
reaches the set point
temperature
4.
Wait until the primary
circuit reaches the set
point temperature, then
start the secondary
circuit’s
pump
4.
Wait until the
secondary
circuit reaches the set
point temperature
5. Wait until the
secondary
circuit reaches the set
point temperature
Turn on CCUs (fans turning on)
WARNING - CAUTION
Do not change the plant loads suddenly.
If there are several distinct areas, spread the CCU activation,
so that the machine can adjust to the increase in load step-by-step.