RBI Futera XLF 4000 Скачать руководство пользователя страница 40

40

Finned copper tube gas boilers & water heaters – Boiler manual

FTXLF-IOM-HN-1-110308 Copyright 2008 Mestek, Inc.

commonwealth of massachusetts

installation requirements

notice!

  In the Commonwealth of Massachusetts, the installation 

must be performed by a licensed plumber or gas fitter. 

For all side wall horizontally vented gas fueled equipment in-

1. 

stalled in every dwelling, building or structure used in whole or 

in part for residential purposes, including those owned or oper-

ated by the commonwealth and where the side wall exhaust vent 

termination is less than seven (7) feet above finished grade, in 

the area of the venting, including but not limited to decks and 

porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETEC-

d. 

TORS. At the time of installation of the side wall horizon-

tal vented gas fueled equipment, the installing plumber or 

gasfitter shall observe that a hard wired carbon monoxide 

detector with an alarm and battery back-up is installed on 

the floor level where the gas equipment is to be installed. In 

addition, the installing plumber or gas fitter shall observe that 

a battery operated or hard wired carbon monoxide detector 

with an alarm is installed on each additional level of the dwell-

ing, building or structure served by the side wall horizontal 

vented gas fueled equipment. It shall be the responsibility 

of the property owner to secure the services of qualified li-

censed professionals for the installation of hard wired carbon 

monoxide detectors.

In the event that the side wall horizontally vented gas fu-

i. 

eled equipment is installed in a crawl space or an attic, the 

hard wired carbon monoxide detector with alarm and 

battery back-up may be installed on the next adjacent 

floor level.
In the event that the requirements of this subdivision can 

ii. 

not be met at the time of completion of installation, the 

owner shall have a period of thirty (30) days to comply 

with the above requirements; provided, however, that 

during said thirty (30) day period, a battery operated car-

bon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS. Each 

e. 

carbon monoxide detector as required in accordance with the 

above provisions shall comply with NFPA 720 and be ANSI/

UL 2034 listed and IAS certified. 
SIGNAGE. A metal or plastic identification plate shall be 

f. 

permanently mounted to the exterior of the building at a 

minimum height of eight (8) feet above grade directly in line 

with the exhaust vent terminal for the horizontally vented gas 

fueled heating appliance or equipment. The sign shall read, 

in print size no less than one-half (1/2) inch in size, “GAS 

VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-

STRUCTIONS”.
INSPECTION. The state or local gas inspector of the side 

g. 

wall horizontally vented gas fueled equipment shall not ap-

prove the installation unless, upon inspection, the inspector 

observes carbon monoxide detectors and signage installed 

in accordance with the provisions of 248 CMR 5.08(2)(a)1 

through 4. 

  Improper venting can result in excessive levels of carbon 

monoxide which can cause severe personal injury or 

death!

Exemptions  —  The  following  equipment  is  exempt  from 

2. 

248 CMR 5.08(2)(a) 1 through 4:

The equipment listed in Chapter 10 entitled “Equipment Not 

a. 

Required To Be Vented” in the most current edition of NFPA 

54 as adopted by the Board; and
Product Approved side wall horizontally vented gas fueled 

b. 

equipment installed in a room or structure separate from the 

dwelling, building or structure used in whole or in part for 

residential purposes.

MANUFACTURER REQUIREMENTS — GAS EQUIP-

3. 

MENT VENTING SYSTEM PROVIDED.

When the manufacturer of Product Approved side wall hori-

a. 

zontally vented gas equipment provides a venting system de-

sign or venting system components with the equipment, the 

instructions provided by the manufacturer for installation of 

the equipment and the venting system shall include:

Detailed instructions for the installation of the venting 

i. 

system design or the venting system components; and
A complete parts list for the venting system design or 

ii. 

venting system. 

MANUFACTURER REQUIREMENTS — GAS EQUIP-

4. 

MENT  VENTING SYSTEM NOT PROVIDED.

When the manufacturer of a Product Approved side wall 

a. 

horizontally vented gas fueled equipment does not provide 

the parts for venting the flue gases, but identifies “special vent-

ing systems”, the following requirements shall be satisfied by 

the manufacturer:

The referenced “special venting system” instructions shall 

i. 

be included with the appliance or equipment installation 

instructions; and 
The “special venting systems” shall be Product Approved 

ii. 

by the Board, and the instructions for that system shall 

include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved 

5. 

side wall horizontally vented gas fueled equipment, all venting 

instructions, all parts lists for venting instructions, and/or all 

venting design instructions shall remain with the appliance or 

equipment at the completion of the installation.

  Improper venting can result in excessive levels of carbon 

monoxide which can cause severe personal injury or 

death!

260 North Elm Street  

7555 Tranmere Drive

Westfield, MA 01085 

 

Mississauga, Ontario L5S 1L4 Canada 

Phone: (413) 568-9571  

Phone: (905) 670-5888

Fax: (413) 568-9613 

Fax: (905) 670-5782

www.rbiwaterheaters.com

MACODE-3

Содержание Futera XLF 4000

Страница 1: ...boiler during construction Construction dust and particulate particularly drywall dust will cause contamination of the burner resulting in possible severe personal injury death or substantial property...

Страница 2: ...DP switch blocked air 10 inlet DP switch blocked flue 11 DP switch blower prov 12 ing DP switch pilot air prov 13 ing Ignitor 14 Pilot gas valve and pilot gas 15 pressure regulator Flow switch 16 Low...

Страница 3: ...ommonwealth of Massachusetts you MUST FOLLOW the additional instructions contained in RBI s instruc tion sheet MACODE 3 located in the back of this manual The owner should maintain a record of all ser...

Страница 4: ...it abledrainpanthat sadequatelydrainedmustbeinstalledunder the unit DO NOT place this boiler water heater in a location that 5 would restrict the introduction of combustion air into the unit or subjec...

Страница 5: ...ating the free area necessary to meet the make up air requirements of the enclosure consideration must be given to the blockage effects of louvers grills and screens Screens must have a minimum mesh s...

Страница 6: ...nd win 3 dows and all doors between the space in which the ap pliances remaining connected to the common venting system are located and other spaces of the building Turn on clothes dryers and any appl...

Страница 7: ...be joined and sealed in accordance with the vent system manufacturer s instructions Whenhorizontalventrunsexceed5ft 1 5mtheymustbesupported at 3 ft 0 9 m intervals with overhead hangers The vent syst...

Страница 8: ...nning horizontal combustion air and venting for single or multiple units exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences...

Страница 9: ...ot exceed 100 feet each See Table 3 or 4 for min pipe diameters Locate exhaust terminal downwind from air intake to reduce potential for flue gas recirculation Failure to complycouldresultinsevere per...

Страница 10: ...ed and sized Exterior masonry chimneys should not be used unless properly lined to prevent condensation and draft problems Table 5 lists the equivalent breeching and flue sizes required for the boiler...

Страница 11: ...alent lengths up to100 feet maximum In this configuration the boiler water heater blower is used to push the flue products horizontally to the outdoors see Figure 7 The air for combustion is taken fro...

Страница 12: ...s than 33 input Category II chimney inspection sizing Masonry chimneys when used must be lined with a metal liner certified for Category IV venting A thorough inspection of the masonry chimney must be...

Страница 13: ...vent system is designed using accepted engineering practices and the design calculations prove there is no need for barometric dampers the barometric dampers may be omitted When required by ap plicab...

Страница 14: ...proved method If the unit must be shut off for any reason the electric 3 gas and water supplies MUST be shut off and the unit and its pump completely drained Improper outdoor installation of this unit...

Страница 15: ...15 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Futera XLF Piping Figure 9...

Страница 16: ...rmal expansion must be installed in the heating system An expansion tank must be installed close to the boiler on the suction side of the pump An air scoop and automatic air vent must also be installe...

Страница 17: ...2 requirements All boilers furnished with factory mounted 3 outlet water temperature gauge Boiler pump purging required Use termi 4 nals supplied All primary secondary piping systems re 5 quire a rem...

Страница 18: ...intain Inlet Temperature Above Dew Point T1 Temp Min 140o F 60o C Sealed Combustion 1 Turn heater on and open valves A B 2 After steady state operation if T1 is less than Temp Min slowly close valve B...

Страница 19: ...ghaFuteraXLF water heater is 260 GPM 16 4 L when equipped with coppertubes Thecupronickelheatexchangerallowsfor 315 GPM 19 9 L s See Table 9 page 20 RBI water heaters are designed to run scale free Du...

Страница 20: ...ditional precautions must be observed due to unusual characteristics of the local water supply Call the nearest RBI representative for details To properly size the pump a grain hardness andpHtestmustb...

Страница 21: ...th 30 total 6 90 4 o elbows full pipe size CAUTION MEASURE WATER HARDNESS AND pH AT JOB SITE 5 The pH and water hardness must be measured before selecting heat exchanger and pump Consult the Heat Exch...

Страница 22: ...y piping has the capacity to meet the demand Figure16depictstheproperwaytoconnecttheboiler waterheater to the gas supply piping The manual shut off valve MUST be in stalled in the supply piping It sho...

Страница 23: ...Gate valve Gas cock 2 5 2 10 3 1 2 3 0 2 6 2 12 3 1 4 3 5 3 7 7 15 3 1 8 4 5 4 10 1 20 2 2 4 6 0 5 12 6 25 2 2 9 7 3 6 15 2 30 4 3 5 13 4 Equivalent lengths above are for threaded fittings Multiply v...

Страница 24: ...the heating system piping Close the make upwatervalveandcheckandcleanthestrainersandmake upwater pressure reducing valve Openthemake upwatervalveandadjustthesystempressureifnec essary The system shou...

Страница 25: ...loweroperatesatminimumignitionsetting Seethecalibra 1 tionsectioninthe HeatNetControl IOM to enter the calibra tion menus The ignition transformer is energized The pilot solenoid valve 2 opens for the...

Страница 26: ...tch on HeatNet control 13 board to the LOW FIRE position The boiler will begin the start up sequence 14 Allow the boiler to pre purge and enter the pilot ignition cycle 15 Ifpilotlights indicatedbyago...

Страница 27: ...ARED STATE A few random speckles of red are acceptable but large concentrations of spots or large areas of red are not If large amounts of red concentrations are observed verify combustion readings Le...

Страница 28: ...orrectly When finished disable the low fire hold switch and replace test 8 portstonormalstate Removethemanometerconnectionsand close the control panel door The Futera XLF boiler allows for many modes...

Страница 29: ...could indicate undersized gas line or insufficient gas supply Staticandoperatinggaspressurerequiredatthegasvalveinletis 2 listed in the Table above If the gas pressure is above the limit above a lock...

Страница 30: ...he gas supply lines and turn 1 off electrical power to the boiler water heater RemoveburnerfollowingtheinstructionsintheBurnerRemoval 2 section Remove the front jacket panel and combustion chamber doo...

Страница 31: ...does contact a qualified service technician to have it inspected NEVERtrytocleanorrepairthereliefvalve Ifthevalve fails to operate properly have it replaced Theaquastathighlimitcontrolsthemaximumwater...

Страница 32: ...32 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Futera XLF pressure sensor hose routing Figure 23...

Страница 33: ...33 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Exploded view Figure 24 Repair parts...

Страница 34: ...34 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Repair parts continued Figure 20 Electrical components Figure 25...

Страница 35: ...11 0412 1 1 NS Flange 2 11 0219 2 2 19 Low Gas Pressure Switch Manual Reset 11 0422 1 1 NS Firing Valve 3 4 11 0461 1 1 NS Ball Valve 11 0395 1 1 20 Gas Hose 53 4001 1 1 21 Firing Valve 2 11 0459 1 1...

Страница 36: ...252 1 1 46 Heat Exchanger Assembly Copper 70 3577 1 70 3579 1 Heat Exchanger Assembly cupronickel 70 3581 1 70 3583 1 47 O ring 06 0007 2 2 48 Frequency Drive 15 0230 1 1 49 Flame Safeguard RM7897C 16...

Страница 37: ...0 Collar Fan Transition 01 0201s 1 1 60a Gasket 06 0004 1 1 60b Fan Hold Down Plate 04 0596 1 1 61 Pump Contactor Relay 15 0118 2 2 62 Mini Fan 12 0021 1 1 63 Air Funnel 04 1016 1 1 64 Solenoid Valve...

Страница 38: ...h in the bottom right of the electrical panel on the main HeatNet board Also locate the manometer test manifold in the bottom of the electrical panel Disable any external call for heat and toggle the...

Страница 39: ...pbelow140 o F 60o C Operating atlowerreturntemperaturesislikelytocausecondensationintheprimaryheatexchanger resultingincorrosionandpossible failure of the heat exchanger COMMISSIONING THE BOILER WATER...

Страница 40: ...ead in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS INSPECTION The state or local gas inspector of the side g wall horizontally vented gas...

Отзывы: