RBI Futera XLF 4000 Скачать руководство пользователя страница 19

19

Finned copper tube gas boilers & water heaters – Boiler manual

FTXLF-IOM-HN-1-110308 Copyright 2008 Mestek, Inc.

Domestic WAter sUppLy pipinG

  Proper controls must be used to prevent water supplied 

for domestic use from exceeding 130

o

F, 54

o

C or a scald 

injury will occur! When higher water temperatures are 

required for appliances such as a dishwasher, a mixing 

valve or some other tempering means must be installed. 

Households with small children may require water 

temperatures less than 120

o

F, 49

o

C. Local codes must 

be complied with!

General piping requirements 

Ensure that the water heater is equipped with bronze headers. Piping 

and components connected to the water heater must be suitable for 

use with potable water. The water heater must not be connected to 

any heating system piping or components previously used with a non-

potable water heating appliance. No toxic chemicals, such as those  

used for boiler treatment, are to be introduced into the potable water 

used for space heating. If a hot water storage tank is used in the system 

it must be equipped with a temperature and pressure relief valve that 

complies with ANSI Z21.22 or CAN-4.4 and CAN-4.6.

  The storage tank must be located as close to the water 

heater as possible to prevent excessive head loss which 

will reduce flow.

Water chemistry

The required temperature rise across the water heater is based on 

water having a hardness between 8 and 18 grains per gallon with 

a level of dissolved solids not exceeding 350 ppm. Water having a 

hardness less than 8 grains can cause excessive corrosion of the heat 

exchanger. Water that has a hardness greater than 18 grains per gallon 

and/or a level of dissolved solids exceeding 350 ppm will require a 

recalculation of the pump size and temperature rise. 

A  cupronickel  heat  exchanger  may  also  be  required.  The  

manufacturer should be consulted when these water conditions are 

encountered. See Table 8, page 20.

  The maximum allowable flow rate through a Futera XLF 

water heater is 260 GPM, 16.4 L when equipped with 

copper tubes. The cupronickel heat exchanger allows for  

315 GPM, 19.9 L/s. See Table 9, page 20.

RBI  water  heaters  are  designed  to  run  scale  free.  Due  to 

the  extreme  variables  of  water  conditions  world  wide  it  is 

necessary  to  consider  pH  values  and  water  hardness  in  

relationship to scaling. It is crucial to consider these two variables 

when making heat exchanger and pump selections. If local water 

conditions are extreme, follow the guidelines in the Heat Exchanger 

temperAtUre rise controL

  Water returned to the water heater inlet must 

not  be  less  than  140

o

F,  60

o

C  or  excessive 

condensation of the products of combustion 

will damage the water heater, voiding the warranty. 

The method outlined below can be employed to 

prevent this condition from occurring. 

 

A balancing valve should be installed on the 

outlet side of  the water heater for purposes 

of  adjusting  the  flow  rate  through  the  heat 

exchanger.  Thermometers  are  installed  

on both the inlet and outlet of the water heater 

for determining the temperature rise through the 

unit. 

 

The proper velocity through the water heater 

must be maintained in accordance with Table 9, 

page 20 for efficient operation and long life.  If 

the temperature rise through the water heater is 

lower than recommended the water velocity is 

too high. Premature erosion of the heat exchanger 

will occur. Conversely, if the temperature rise is 

higher than recommended in Table 9, page 20 the 

flow rate is too low. Scaling and softening of the 

heat exchanger will occur.

 

Thermostatic Mixing Valve – Water Above 140

o

F, 

60

o

C Water can be stored at temperatures above 

140

o

F, 60

o

C provided that a thermostatically 

controlled mixing valve is used to temper the 

hot water to an acceptable temperature before 

it’s supplied for domestic use. 

 

The mixing valve MUST be set to prevent a scald 

injury from occurring, see the caution against 

scalding.

 

Storage of water for domestic use above 140

o

F, 

60

o

C  will  provide  an  increased  quantity  of 

tempered water and help prevent the growth of 

water born bacteria.

Содержание Futera XLF 4000

Страница 1: ...boiler during construction Construction dust and particulate particularly drywall dust will cause contamination of the burner resulting in possible severe personal injury death or substantial property...

Страница 2: ...DP switch blocked air 10 inlet DP switch blocked flue 11 DP switch blower prov 12 ing DP switch pilot air prov 13 ing Ignitor 14 Pilot gas valve and pilot gas 15 pressure regulator Flow switch 16 Low...

Страница 3: ...ommonwealth of Massachusetts you MUST FOLLOW the additional instructions contained in RBI s instruc tion sheet MACODE 3 located in the back of this manual The owner should maintain a record of all ser...

Страница 4: ...it abledrainpanthat sadequatelydrainedmustbeinstalledunder the unit DO NOT place this boiler water heater in a location that 5 would restrict the introduction of combustion air into the unit or subjec...

Страница 5: ...ating the free area necessary to meet the make up air requirements of the enclosure consideration must be given to the blockage effects of louvers grills and screens Screens must have a minimum mesh s...

Страница 6: ...nd win 3 dows and all doors between the space in which the ap pliances remaining connected to the common venting system are located and other spaces of the building Turn on clothes dryers and any appl...

Страница 7: ...be joined and sealed in accordance with the vent system manufacturer s instructions Whenhorizontalventrunsexceed5ft 1 5mtheymustbesupported at 3 ft 0 9 m intervals with overhead hangers The vent syst...

Страница 8: ...nning horizontal combustion air and venting for single or multiple units exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences...

Страница 9: ...ot exceed 100 feet each See Table 3 or 4 for min pipe diameters Locate exhaust terminal downwind from air intake to reduce potential for flue gas recirculation Failure to complycouldresultinsevere per...

Страница 10: ...ed and sized Exterior masonry chimneys should not be used unless properly lined to prevent condensation and draft problems Table 5 lists the equivalent breeching and flue sizes required for the boiler...

Страница 11: ...alent lengths up to100 feet maximum In this configuration the boiler water heater blower is used to push the flue products horizontally to the outdoors see Figure 7 The air for combustion is taken fro...

Страница 12: ...s than 33 input Category II chimney inspection sizing Masonry chimneys when used must be lined with a metal liner certified for Category IV venting A thorough inspection of the masonry chimney must be...

Страница 13: ...vent system is designed using accepted engineering practices and the design calculations prove there is no need for barometric dampers the barometric dampers may be omitted When required by ap plicab...

Страница 14: ...proved method If the unit must be shut off for any reason the electric 3 gas and water supplies MUST be shut off and the unit and its pump completely drained Improper outdoor installation of this unit...

Страница 15: ...15 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Futera XLF Piping Figure 9...

Страница 16: ...rmal expansion must be installed in the heating system An expansion tank must be installed close to the boiler on the suction side of the pump An air scoop and automatic air vent must also be installe...

Страница 17: ...2 requirements All boilers furnished with factory mounted 3 outlet water temperature gauge Boiler pump purging required Use termi 4 nals supplied All primary secondary piping systems re 5 quire a rem...

Страница 18: ...intain Inlet Temperature Above Dew Point T1 Temp Min 140o F 60o C Sealed Combustion 1 Turn heater on and open valves A B 2 After steady state operation if T1 is less than Temp Min slowly close valve B...

Страница 19: ...ghaFuteraXLF water heater is 260 GPM 16 4 L when equipped with coppertubes Thecupronickelheatexchangerallowsfor 315 GPM 19 9 L s See Table 9 page 20 RBI water heaters are designed to run scale free Du...

Страница 20: ...ditional precautions must be observed due to unusual characteristics of the local water supply Call the nearest RBI representative for details To properly size the pump a grain hardness andpHtestmustb...

Страница 21: ...th 30 total 6 90 4 o elbows full pipe size CAUTION MEASURE WATER HARDNESS AND pH AT JOB SITE 5 The pH and water hardness must be measured before selecting heat exchanger and pump Consult the Heat Exch...

Страница 22: ...y piping has the capacity to meet the demand Figure16depictstheproperwaytoconnecttheboiler waterheater to the gas supply piping The manual shut off valve MUST be in stalled in the supply piping It sho...

Страница 23: ...Gate valve Gas cock 2 5 2 10 3 1 2 3 0 2 6 2 12 3 1 4 3 5 3 7 7 15 3 1 8 4 5 4 10 1 20 2 2 4 6 0 5 12 6 25 2 2 9 7 3 6 15 2 30 4 3 5 13 4 Equivalent lengths above are for threaded fittings Multiply v...

Страница 24: ...the heating system piping Close the make upwatervalveandcheckandcleanthestrainersandmake upwater pressure reducing valve Openthemake upwatervalveandadjustthesystempressureifnec essary The system shou...

Страница 25: ...loweroperatesatminimumignitionsetting Seethecalibra 1 tionsectioninthe HeatNetControl IOM to enter the calibra tion menus The ignition transformer is energized The pilot solenoid valve 2 opens for the...

Страница 26: ...tch on HeatNet control 13 board to the LOW FIRE position The boiler will begin the start up sequence 14 Allow the boiler to pre purge and enter the pilot ignition cycle 15 Ifpilotlights indicatedbyago...

Страница 27: ...ARED STATE A few random speckles of red are acceptable but large concentrations of spots or large areas of red are not If large amounts of red concentrations are observed verify combustion readings Le...

Страница 28: ...orrectly When finished disable the low fire hold switch and replace test 8 portstonormalstate Removethemanometerconnectionsand close the control panel door The Futera XLF boiler allows for many modes...

Страница 29: ...could indicate undersized gas line or insufficient gas supply Staticandoperatinggaspressurerequiredatthegasvalveinletis 2 listed in the Table above If the gas pressure is above the limit above a lock...

Страница 30: ...he gas supply lines and turn 1 off electrical power to the boiler water heater RemoveburnerfollowingtheinstructionsintheBurnerRemoval 2 section Remove the front jacket panel and combustion chamber doo...

Страница 31: ...does contact a qualified service technician to have it inspected NEVERtrytocleanorrepairthereliefvalve Ifthevalve fails to operate properly have it replaced Theaquastathighlimitcontrolsthemaximumwater...

Страница 32: ...32 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Futera XLF pressure sensor hose routing Figure 23...

Страница 33: ...33 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Exploded view Figure 24 Repair parts...

Страница 34: ...34 Finned copper tube gas boilers water heaters Boiler manual FTXLF IOM HN 1 110308 Copyright 2008 Mestek Inc Repair parts continued Figure 20 Electrical components Figure 25...

Страница 35: ...11 0412 1 1 NS Flange 2 11 0219 2 2 19 Low Gas Pressure Switch Manual Reset 11 0422 1 1 NS Firing Valve 3 4 11 0461 1 1 NS Ball Valve 11 0395 1 1 20 Gas Hose 53 4001 1 1 21 Firing Valve 2 11 0459 1 1...

Страница 36: ...252 1 1 46 Heat Exchanger Assembly Copper 70 3577 1 70 3579 1 Heat Exchanger Assembly cupronickel 70 3581 1 70 3583 1 47 O ring 06 0007 2 2 48 Frequency Drive 15 0230 1 1 49 Flame Safeguard RM7897C 16...

Страница 37: ...0 Collar Fan Transition 01 0201s 1 1 60a Gasket 06 0004 1 1 60b Fan Hold Down Plate 04 0596 1 1 61 Pump Contactor Relay 15 0118 2 2 62 Mini Fan 12 0021 1 1 63 Air Funnel 04 1016 1 1 64 Solenoid Valve...

Страница 38: ...h in the bottom right of the electrical panel on the main HeatNet board Also locate the manometer test manifold in the bottom of the electrical panel Disable any external call for heat and toggle the...

Страница 39: ...pbelow140 o F 60o C Operating atlowerreturntemperaturesislikelytocausecondensationintheprimaryheatexchanger resultingincorrosionandpossible failure of the heat exchanger COMMISSIONING THE BOILER WATER...

Страница 40: ...ead in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS INSPECTION The state or local gas inspector of the side g wall horizontally vented gas...