FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS
9
Figure 5 – Side Wall Venting
1.5 FT
0.5 m
1/4 IN. PER F00T
20 mm/m
Figure 6 – Vertical Venting
with a Metal Chimney System
SIDE WALL VENT,
POSITIVE PRESSURE, CATEGORY IV
In this confi guration the boiler/water heater blower is used
to push the fl ue products horizontally to the outdoors, see
Figure 5. The air for combustion is taken from the space
in which the unit is installed. The applicable instructions
under the “COMBUSTION AIR & VENTILATION” section
must be followed! The vent guidelines under the Horizontal
Direct Vent Systems section must also be followed.
WA R N I N G : Fa i l u r e t o m a i n t a i n m i n i mu m
clearances between vent connectors and any
combustible material can result in a fi re causing
extensive property damage, severe personal injury
or death!
NOTE: When using a listed metal chimney system the
chimney system manufacturer’s instructions must be
followed.
10 FT.
3.1 m