FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS
19
Figure 13 - Multiple Water Heating Piping (CW Models Only)
(See Notes)
NOTES:
1. When using intermittent pump and pump delay, locate remote aquastat well in lower 1/3 of tank. Install
aquastat with heat sensing compound.
2. Thermal expansion tank may be required, check local codes.
3. CAUTION: TEST WATER HARDNESS AND pH AT JOB SITE.
Be sure to specify when ordering the pH and water hardness. This must be measured before selecting heat
exchanger and pump. Consult the Heat Exchanger Graph before making selection.
4. Common piping must be sized for maximum combined heater fl ow.
5. Hot water tanks should be equipped with a combination temperature & pressure relief valve.
6. MA Code requires an 1/8" hole in check valve to compensate for thermal expansion.
7. Use balance valve to set the temperature rise through the boiler. (Delta T)
8. Boiler and pump purging required. Air must be purged from 3-way valve after boiler is fi lled. Use
purge valves provided. Purge valve may be located on pump fl ange. On multiple boiler installations
the fl ow switch may fail due to trapped air. See manual procedure.
Notice: These drawings show suggested piping confi guration and valving. Check with local codes and
ordinances for specifi c requirements.
Air Vent
Aquastat Union
Automatic
Thermometer
Flow Switch
Pressure
Relief Valve
Reducing Valve
Check Valve
Pressure
Pump
Valve
Balance Valve
Vacuum
Relief Valve
Temperature &
Pressure
Relief Valve
Drain Valve
(Typ.)
3-Way
Mixing Valve
1
2
2
1
5
5
4
4
6
7
8
8
7
8
8
D-18 Rev.1