FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS
2
CONTENTS
Before Your Start
page 2
Ratings & Capacities
page 3
Boiler/Water Heater Location
page 3
Combustion Air & Ventilation
page 3
General Venting Guidelines
page 5
Outdoor Venting
page 10
General Piping Requirements
page 11
Heating System Piping
page 11
Domestic Water Supply Piping
page 16
Gas Supply Piping
page 20
Electrical Wiring
page 21
General Operation
page 21
Operating Instructions
page 22
Sequence of Operation
page 24
Checking & Adjustments
page 25
HeatNet Field Wiring
page 26
Control Description
page 28
Diagnostics
page 28
Maintenance
page 31
Trouble-Shooting
page
33
Repair Parts
page 35
Startup Sheet
page 42
Warranty
page
48
BEFORE YOU START
This manual covers the application, installation, operation
and maintenance of a Futera Series fi nned copper heating
boiler/water heater.
To obtain the safe, dependable, effi cient operation and long
life for which this heating boiler/water heater was designed,
these instructions must be read, understood and followed.
AVERTISSMENT. Assurez-vous de bien suivre les instructions données dans cette notice pour
réduire au minimum le risque d’incendie ou d’explosion ou pour éviter tout dommoge matériel,
toute blessure ou la mort
Ne pas entreposer ni utiliser d’essence ou ni d’autres vapeurs ou liquides infl ammables à
proximité de cet appareil ou de tout autre appareil.
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ:
• Ne pas tenter d’allumer d’appareil.
• Ne touchez à aucun interrupteur; ne pas vous servir des téléphones se trouvant dans le
bâtiment.
• Appelez immédiatement votre fournisseur de gas depuis un voisin. Suivez les intructions du
fournisseur.
• Si vous ne purvez rejoindre le fournisseur, appelez le service des incendies.
L’installation et l’entretien doivent être assurés par un installateur ou un service d’entretien
qualifi é ou par le fournisseur de gaz.
The Futera Series finned copper heating boiler/water
heaters have been design certified by CSA for use with
natural and propane gas under the latest revision of
ANSI-Z21.10.3/CSA 4.3, Gas Water Heaters, ANSI-Z21.13/
CSA 4.9, Gas-Fired Low Pressure Steam and Hot Water
Boilers and CAN1-3.1, Industrial and Commercial Gas
Fired Packaged Boilers. Each unit has been constructed
and hydrostatically tested for a maximum working pressure
of
160 psi
,
1103 kPa
in accordance with Section IV of the
A.S.M.E. Boiler and Pressure Vessel Code.
All aspects of the boiler/water heater installation must
conform to the requirements of the authority having
jurisdiction, or, in the absence of such requirements, to
the National Fuel Gas Code, ANSI Z223.1/NFPA 54-latest
revision. Where required by the authority having jurisdiction,
the installation must conform to the Standard for Controls
and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
In Canada, the installation must be in accordance with the
requirements of CSA B149.1 or .2, Installation Code for
Gas Burning Appliances and Equipment.
If installed in the Commonwealth of Massachusetts, you
MUST FOLLOW the additional instructions contained in
RBI’s instruction sheet MACODE-3. Which is located in the
back of this manual.
The owner should maintain a record of all service work
performed with the date and a description of the work done.
Include the name of the service organization for future
reference.
Direct all questions to your RBI distributor or contact the
RBI Customer Service Department at: 260 North Elm
Street, Westfi eld, MA 01085 for US or 7555 Tranmere
Drive, Mississauga ONT L5S 1L4 for Canada. Always
include the model and serial numbers from the rating plate
of the boiler/water heater in question.