background image

15

www.rbcbioscience.com

Select Piston test in Maintenance menu 

Please place the “system test tool” prepared in advance in A area 
(please refer to page 7), wherein put water of 1ml in empty Sample 
Tube, after that, select Start to start test 

The purpose of this step is mainly to test the smoothness when 
the system takes up TIP.

The display shows  Piston Test Step 1  The system will move to take 
up TIP  Please check whether TIP is taken up smoothly  If you find 
any sticking phenomena, please press Abort to stop test and move 
the stuck TIP back to Tip Holder and execute the program again  
If the problem happens continuously, please contact your local 
dealer to handle  Press Next to go to the next step for test if the 
taking up is smooth 

The purpose of this step is mainly to test TIP leakage of the sytem.

The system will absorb water from Sample Tube. Please check 
whether the liquid levels of each TIP are at the same horizontal or 
there is a gradually lowering situation. If the liquid levels are not at 
the same horizontal or there is a lowering situation, please press 
Finish to test again. If the problem happens continuously, please 
refer to page 14 to replace new O-Ring for problematic Piston 
and test this item again after replacement. If the problem is still 
not solved, please contact local dealer to handle.

━ Piston Test

Maintenance

Please select Item

Back

UV Sterilization

Moving Test

Heater Test

Rejection Tip

Piston Test

O-Ring  & Piercing Needles  

DC Motor Operate

Update Program Files

Start

Stop

Piston Test

Press START to run

Back

A

B

D

A

B

E

Replace O-Rings

Clean Piercing Needles

Start

Stop

O-Ring & Piercing Needles  

Select item and Press Start to run

Back

Next

Abort

Piston Test Step 1

Machine taking up Tips, please check whether the Tips move smoothly. If you observe a Tip Holder 

stuck, please press the STOP button immediately to stop and remove the jammed Holder. 

Replace O-Rings

Clean Piercing Needles

Start

Stop

O-Ring & Piercing Needles  

Select item and Press Start to run

Back

Finish

Piston Test Step 2

Tip will absorb water from Sample Tube, please check the  liquid level of each columns are 

at same horizontal.

Next Step

Next Step

Next Step

Содержание MagCore HF48

Страница 1: ...llCartridge 7 TouchPanelandUserInterface 8 MainMenu 8 PanelFunctionalArea 8 EmergencyStopandWarning 9 Start 10 LoadProgram 11 SavePrograms 12 DeletePrograms 12 UpdateProgramFiles 13 EasyMaintenance 13...

Страница 2: ...11 GroundingorPolarization Thisproductmaybeequippedwithapolarized alternating current line plug a plug having one blade wider than the other This plug will fit into the power outlet only one way This...

Страница 3: ...99 inches NetWeight 250kg 551 25Lb Specification OperationParameters OperationEnvironment Applications Whole Blood 200 400ul Viral Nucleic Acid DNA RNA Tissue Genomic DNA Plant Genomic DNA Bacteria Ki...

Страница 4: ...50 Tip TipHolderSetX 50 Elution Carrier X 1 CartridgeCarrierB X 1 CartridgeCarrierA X 1 TipCarrierB X1 TipCarrierA X1 PowerCord X1 Lubricant X1 O RingX 24 Systemtesttoolsshouldbekeptincleanplacesandth...

Страница 5: ...n Area Shutter Fixed Stands four legs Fixed Bolt on the Top Cover of Part Chamber SystemOverview Cooling Fans Power Switch and Plug Power Switch red Light Switch green Part Chamber Maintenance Cover S...

Страница 6: ...e for system installationandventilationbeforeinstallation When installation the system please make sure the elevation difference by using level rail for measurement and fixed stands forfine tuning Sys...

Страница 7: ...egroundlevel andtightenfixedscrews Shearthetransportationbeltandreturnthetopcoverofpart chamber ShearthebeltsonRacks Plugthepowercordandturnonthemainpower Turnonthepower red andthesystemwillbeinitiali...

Страница 8: ...ect usemay causethesystem inoperablebecauseCarrier isnot detected InstallCartridge Install Tip and SampleTube B A InsertTipandSampleTubeintotheslotsofTipCarrier Afterthat placetheentiresetofTipCarrier...

Страница 9: ...rial number error Setup Systemtimesetup Start Stop Save Back Load Program Start 24 Test 48 Test DNase I Treatment Sample Volume Elution Volume Please select Cartridge Code Elution Buffer Optical Detec...

Страница 10: ...e RemoveDNA SampleVolumn ElutionVolumn ElutionBuffer 48 105PlasmaDNAExtractionKit 1 2ml 200 l 150 l A A B B E D Warning Abort Program Stopped Press ABORT to terminate the process or CONTIUNE to run Co...

Страница 11: ...Sample Volume Elution Volume Please select Optical Detrction Optical Detection Save Back Load Program 101 MagCore Genomic DNA Whole Blood Kit Speedy installation Start Yes No 48 Test Test CartridgeCo...

Страница 12: ...red Program 3 Stored Program 4 Stored Program 5 Stored Program 6 Stored Program 7 Stored Program 8 Load Program Yes No 48 Test CartridgeCode RemoveDNA SampleVolumn ElutionVolumn ElutionBuffer 105Plasm...

Страница 13: ...1 2ml 200 l 150 l Start Stop Save Back Load Program Start 24 Test 48 Test Cartridge Code Dnase Treatmen Elution Buffer Sample Volume Elution Volume A B D A B E Please select Channel Youmaydeleteyourco...

Страница 14: ...ack UV Sterilization Moving Test Heater Test Rejection Tip Piston Test O Ring Piercing Needles DC Motor Operate Update Program Files EasyMaintenanceisforuser smaintenanceitems includingsystemssuchas s...

Страница 15: ...ings Step 2 Applywithnewone Replace O Rings Clean Piercing Needles Start Stop O Ring Piercing Needles Select item and Press Start to run Back Finish Replace O Rings Step 3 Usesuppliedlubricatingoil to...

Страница 16: ...horizontalorthereisaloweringsituation pleasepress Finishtotestagain Iftheproblemhappenscontinuously please refertopage14toreplacenewO RingforproblematicPiston andtestthisitemagainafterreplacement Ifth...

Страница 17: ...Program Files HeaterTest Start Stop Heater Test Press START to run Back HeaterA 65 C 148 F Heater B 65 C 148 F Thisfunctionismainlyforthesystemtoperformrejectionafter emergencystoporoperationinterrup...

Страница 18: ...Update Program Files Start Stop 30min 60min UV Sterilization select Item and press START to run Back 30 00 Remaining Time Complete Back UVSterilization Openthetopcoverofthepartchamber ApplynewUVlamp S...

Страница 19: ...jection Tip Piston Test O Ring Piercing Needles DC Motor Operate Update Program Files Maintenance Please select Item Back UV Sterilization Moving Test Heater Test Rejection Tip Piston Test O Ring Pier...

Страница 20: ...0 Q W E R T Y U I O P Backspace Enter A S D F G H J K L Z X C V B N M System Timing Setting Start Maintenance Loadprogram Setup Status 2012 06 07 12 12 12 Time Setting Back Year 2012 24 h Hour 12 Minu...

Страница 21: ...p Operating Time Hr 00 Min 00 Sec 00 UI Software Ver Ver SUPER2012 0 1 PLC Software Ver Ver SUPER2012 0 1 Machine serial number Error history list UV Time Reset Status Back System Date 2012 12 12 Syst...

Страница 22: ...Choosethecorrespondingslotofyoursampleandscanyour sample scode afterthecompletioncodeisdisplayedonthe touchpanel placethesampleintotheslot ifyouhavemorethan onesample pleaserepeattheabovebarcodescanni...

Страница 23: ...ystem test and check liquid levels of each columnareatthesamehorizontal Liquidleveloversuctionfilter 1 Wrongsamplematerials 2 Wrongsampletubes 1 PleaserefertoMagCore kitmanual 2 Pleaseusetheprovidedsa...

Страница 24: ...TEL 886 2 8912 1200 FAX 886 2 8912 1300 3F No 132 Ln 235 BaoqiaoRd XindianDist NewTaipeiCity23145 TAIWAN http www rbcbioscience com...

Отзывы: