WARNINGS
4
Pay Attention to These Terms
4
BEFORE INSTALLATION
5
Product Receipt
5
Model Identification
5
Ratings and Certifications
5
Installations at Elevation
5
Component Locations
6
General Information
6
Time/Temperature Relationships
in Scalds
7
GENERAL SAFETY
7
INSTALLATION
8
Installation Codes
8
Equipment Base
8
Clearances
8
Combustion and Ventilation Air
9
Conventional Combustion Air Supply
13
Water Piping
14
Hydronic Heating
15
Domestic Hot Water
16
Combined Potable Water and Space
Heating
17
Pool Heating
17
Gas Supply
19
Electrical Power Connections
20
Field Wiring Connection
22
Venting
22
Venting Installation Tips
24
Venting Configurations
24
Outdoor Installation
29
PVC Venting Option
30
Controls
32
Heater Sequence of Operation
38
WIRING DIAGRAMS
42
Models 1005 & 1505
42
Model 2005
43
START-UP
44
Pre Start-up
44
Pre Start-up Check
44
Initial Start-up
45
Preparation
45
Start-Up
45
OPERATION
49
Lighting Instructions
49
To Turn Off Gas To Appliance
49
TROUBLESHOOTING
50
UDB Fault History
51
MAINTENANCE
51
Suggested Minimum
Maintenance Schedule
51
Preventive Maintenance
Schedule
52
APPENDIX
53
Inside Air Contamination
53
Important Instructions for the
Commonwealth of
Massachusetts
54
WARRANTIES
55
CONTENTS
3
Содержание Xtherm 1005
Страница 42: ...42 WIRING DIAGRAMS Models 1005 1505 ...
Страница 43: ...43 Model 2005 ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A ...