7.1 Before commissioning
Check the following points before commissioning:
•
Completeness and technically flawless condition of the machine and safety devices.
•
Order and cleanliness at the workplace.
•
Cleanliness of optical components (free of dust and dirt).
•
Activated exhaust system.
•
Complete electrical installation.
•
Correct input voltage of the electrical installation.
•
Environmental conditions according to technical specification.
•
Compliance with all laser safety regulations and measures.
•
Fulfill and compliance with all laser safety requirements according to chapter 2.
If errors or functional deviations should occur during the inspection of the listed points, the machine is not
considered to be safe to operate and must not (no longer) be put into operation until the fault is corrected.
If you have any questions, contact our experienced Technical Support in your local area.
1. Remove the screws of the transport protection on
the y-axis on the left side (2 pieces).
2. Remove the screws of the transport protection on
the x-axis (2 pieces).
1. Level the y-axis (left and right side) using a spirit
level.
ENGLISH
ENGLISH
47 / 81
Содержание R500
Страница 1: ...R500 Operation Manual 8057 Operation Manual 8057_4 0_EN 05 2023 ENGLISH...
Страница 20: ...1 4 7 10 2 5 8 11 3 6 9 ENGLISH ENGLISH 20 81...
Страница 27: ...3 Technical Data The technical data sheet can be found in the appendix of this manual ENGLISH ENGLISH 27 81...
Страница 46: ...7 Connect the water cooling system cable to the cooling alarm connection ENGLISH ENGLISH 46 81...
Страница 75: ...13 Appendix ENGLISH ENGLISH 75 81...
Страница 79: ......